![CPC Router and Repeater Installation And Operation Manual Download Page 15](http://html.mh-extra.com/html/cpc/router-and-repeater/router-and-repeater_installation-and-operation-manual_2674906015.webp)
! "
•
-
$
6.
For every daisy chain in your network, each end-
point must be terminated. You may do this by either
setting termination jumpers on the devices on the
endpoints, or by wiring a Daisy Chain Termination
Block at the end(s) of the daisy chain.
With all the daisy chains in a four-channel repeater
installation, termination can be complex. The best
way to approach the task is to examine each
repeater channel by channel, and look at where each
daisy chain extending from that channel begins and
ends.
Instructions for setting termination jumpers on Ech-
elon devices may be found in the Echelon Network
Device Wiring chapter of your Einstein RX or Ein-
stein BX User’s Guide.
To wire a Daisy Chain Termination Block to the
end of a daisy chain, remove the main Echelon
cable from the last device on the network and con-
nect the end to one side of the Daisy Chain Termi-
nation Block, as shown in the picture. With a
separate length of Echelon cable, connect the other
side of the terminal block to the last device on the
daisy chain. Make sure the shield wires are con-
nected to the middle terminals.
Summary of Contents for Router and Repeater
Page 1: ...026 1605 Rev 3 9 25 00 Router and Repeater Installation and Operation Manual ...
Page 2: ......
Page 4: ......
Page 16: ......
Page 22: ......