IDEAL FOR LARGE OFFICE OR CLASSROOM APPLICATIONS 

IDEAL FOR CORRIDOR OR AISLE APPLICATIONS 

Commissioning will normally be performed by our trained commissioning engineers. 
Please note that prior to commissioning, it is the responsibility of the installing contractor to ensure the 
following: 

 

The RAPID LCMs must be connected and installed as described in the relevant datasheet 

 

The detectors must be installed and plugged into the channel of the LCM as shown on the 
system installation drawings 

 

Mains power must be available 

 

Luminaires must be plugged in 

 

Bus connection must be established and checked 

 
The detector can be set up using our infrared programming handset or computer front end. For pro-
gramming details see the separate programming document. 

Commissioning 