Lower Posts of the header assembly.
Carefully set onto floor.
Lift Header side up and set into place with the Nibs
on the Header Facing the inside of the Pergola.
To keep the Header Assembly upright build an
A-frame brace using your own 8’ long 2x4’s and
fasten with (2) 2.1/2” screws.
Assemble 2nd Header and Post Assembly in loca-
tion as shown.
Carefully lay the post side down and lift the header
side up into an upright position with the Nibs on
the Main Header facing the inside of the pergola.
Nibs