www.costway.com
www.costway.com
STEP 11: Install the table legs (P6) & (P7) and fix them with screws (S3).
The installation is complete.
11
12
9
10
STEP 9: Fix the corner net (P8) with screws (S4).
STEP 10: Install other nets, then fix the four corners (P5) with screws (S5).
06
07