background image

2

B 217 - RTE 98.  Eng.  

25.09.07 LB  

REV. 01

We reserve the right to make changes without notice

COSTER

6. OVERALL DIMENSIONS

Front panel

Container

Cutout for recessed 

mounting

7. FRONT PANEL

  1 – Programming switch  

5 – Opens-Closes LEDs

  2 – Curve adjustment   

6 – Pump LED

  3 – Plant factor K 

7 – Setback temperature 

 

  4 – Power supply LED  

8 – Normal temperature 

1

2

4

7

3

5

6

8

8. ACTUATORS SPEED PROGRAMMER

9. WIRING DIAGRAMS

 

B1 – Flow detector  

E – Burner 

Y – Valve

 

B2 – Outside detector   

M – Plant pump 

T – Transformer

 

  

R – Remote control 

 

General layout 

Control of actuator

    

 

Control

 

 

with voltage other than 230 V

~

burner

2 3

Y

Co

Op

Cl

L N

230 V~

5 6 7

T

2 3

L N

230 V~

6 - 7

In series with

boiler thermoistats

E

5 6 7

F

RTE 98

1 2 3

5 6 7

13

19 20

L N

230 V~

8 9 10

Y

M

Co

Op

Cl

14 18

11

B2

12

B1

R

Summary of Contents for RTE 982

Page 1: ...culation pump in the Normal Sun periods contacts 8 10 are closed while in the Setback Moon periods contacts 8 10 are open 4 DETECTORS ACCESSORIES No Description Type Sensing element Code Datasheet No Description Type Sensing element Code Datasheet ESSENTIAL ACCESSORIES ESSENTIAL ACCESSORIES 1 Surface plant flow temperature detector 1 Surface plant flow temperature detector SCH 010 NTC 10 kΩ B1 N 1...

Page 2: ...tback temperature 4 Power supply LED 8 Normal temperature 1 2 4 7 3 5 6 8 8 ACTUATORS SPEED PROGRAMMER 9 WIRING DIAGRAMS B1 Flow detector E Burner Y Valve B2 Outside detector M Plant pump T Transformer R Remote control General layout Control of actuator Control with voltage other than 230 V burner 2 3 Y Co Op Cl L N 230 V 5 6 7 T 2 3 L N 230 V 6 7 In series with boiler thermoistats E 5 6 7 F RTE 9...

Page 3: ...nd secure it Make the electrical connections according to the wiring diagram and in respect of the safety regulations in force using the following cable types 1 5 mm2 for power supply and the relay control outputs 1 mm2 for the detectors and the remote control Apply power 230 V and check its presence across terminals 2 and 3 Switch off power insert the electronic module in the case pressing it as ...

Page 4: ... and the actual time of day and the day on the 7 day one Adjust if necessary the slope of the heating curve using the potentiometer C COSTER TECNOLOGIE ELETTRONICHE S p A Sede Legale 20132 Milano Via San G B De La Salle 4 a E mail info coster eu Web www coster eu COSTER CONTROLLI TEMPERATURA ENERGIA Head Office Sales Via San G B De La Salle 4 a Tel 39 022722121 20132 Milano Fax 39 022593645 Orders ...

Reviews: