Step 5:
Align the 4 pieces of the Upper Support
Frame to the holes on the Ceiling Mount.
Securely screw into place with the included
screws.
Step 6:
Slide the Lower Support Frame into the
Upper Support Frame. Adjust the height
according to what you measured in Step 1.
Align the holes to the desired height, screw
the 4 pieces of the Lower Support Frame
to the 4 pieces of the Upper Support
Frame together.
7
Step
4
:
Using the Ceiling Mount as a guide drill 4 holes
(8mm or 5/16 drill bit) into the ceiling area
where you will be mounting your range hood.
Fill the holes with the provided anchors. Screw
t
h
e
C
eiling
M
ount securely into place.
Note:
In some cases the Ceiling Mount may already be
attached to the Upper Support Frame
Ceiling Mount
Anchor Screws
Anchors
Ceiling Mount
Upper Support Frame
Upper Support Frame
Lower Support Frame
Step 8:
Extend Duct from the Blower Assembly to the
ceiling through the Ceiling Mount and Connect
to existing duct work.
Blower Assembly
Duct
Ceiling