CORSIVA YACHTING
20
12. BILGE INSTALATION
The bilge system is installed in the galley under the floor.
Automatic bilge pump
Hand bilge pump
Bilge instalation consists of:
1. one automatic bilge pump,
2. one manual bilge pump,
3. outlets and side passages,
4. hoses connecting pumps with outlets and side passages.
Automatic bilge pump can work automatically after powering-up the float switch or by hand,
operating from the switch panel if it is necessary.
Hand bilge pump is under the deck.
DANGER
Installed bilge installation is not intended to dry the damaged yacht.
WARNING
Before each season check the state of connections and the tightness of bilge
installation.
Regularly check the bilge pump work.
Regularly remove dirt from inlet of sucking bilge pump basket.
Never use flammable solvents for bilge cleaning.
CAUTION
Do not discharge oily water overboard, in moment when boat is afloat.
CAUTION
It is recommended to have the onboard bucket which you can use in sudden
cases.