Cornwell Tools MMWC3 Owner'S Manual Download Page 11

Page      of  14 

11 

ASSEMBLY (Continued)

 

18.  Going up the vertical cylinder securement panel (Item 25), align the pre-drilled holes in the left side 

with the pre-drilled holes in the lip of the middle shelf (Item 5). Secure each mounting hole with a 10 

mm bolt and a nut. Repeat for both holes and then again for the one on the back. Then repeat for all 

three mounting holes on the right side of the vertical cylinder securement panel (Item 25). 

19.  Align the pre-drilled holes on the back of the top shelf lip (Item 1) with the pre-drilled holes in the 

vertical cylinder securement panel (Item 25). There is one on the back and one on the side for both 

the right and left sides (Items 1 & 25). Secure with a 10 mm bolt and a nut. Leave these slightly loose 

at this time. 

20.  Align the pre-drilled holes on the front of the top shelf lip (Item 1) with the pre-drilled holes in the front 

vertical panels (Items 3 & 24). Secure with a 10 mm bolt and a nut. Then tighten all the bolts from the 

previous step. 

 

NOTE: The tow handle (Item 2) is reversible. The orientation of the handle will vary depending on the 

equipment and operator preference. 

 

21.  Using the longer 10 mm bolts, slide on a flat washer and slide it through one of the pre-drilled holes 

on the left side of the handle (Item 2). Then slide it through the matching pre-drilled hole on the left 

lip of the top shelf (Item 1). Add a flat washer, lock washer, and secure it with a nut. Leave this nut 

slightly loose at this time. Repeat for both pre-drilled holes in the left side of the handle (Item 2). 

Then repeat for the two mounting holes in the right side of the panel Items 2 & 1). Then tighten all the 

nuts holding the handle. 

22.  You will notice four pre-drilled holes remain in the front vertical panels (Items 3 & 24) and on each 

side of the vertical cylinder securement panel (Item 25). These mounting holes are for cable wraps 

(Item 4). For the top set of holes, the cable wrap (Item 4) should be mounted with the opening up. 

For the bottom set of holes, the cable wrap (Item 4) should be mounted with the opening down. 

Using a 10 mm nut, slide it through the pre-drilled holes in the cable wrap (Item 4) and then through 

the pre-drilled hole in the vertical panel(s) (Items 3 & 24). Secure with a nut. Repeat this for all 

mounting holes on all eight cable wraps (Item 4) on both side of the cart (Items 3 & 24, Item 25 

respectively). 

23.  Find the 3/4-inch holes in the back of the vertical cylinder securement panel (Item 25). Place one end 

of the securement chain (Item 23) in one hole and slide a link down into the bottom groove. Then 

wrap the chain (Item 23) around the cylinder you are securing and place it in the other 3/4-inch hole 

on the other side of the vertical cylinder securement panel (Item 25). 

Summary of Contents for MMWC3

Page 1: ...OWNER S MANUAL 11 2020 WARNING Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating Failure to follow the safety rules and other basic safety precautions may result...

Page 2: ...rocessing Warranty period begins at the time the welder is purchased from and Authorized Reseller of Cornwell Quality Tools products Keep your receipt as proof of purchase Warranty Periods 90 Days War...

Page 3: ...ry and ventilated Do not operate the welder in humid wet or poorly ventilated areas Always have your welder maintained by a qualified technician in accordance with local state and national codes Alway...

Page 4: ...and insulated footwear Insulate yourself from the work piece Avoid contacting the work piece or ground Do not attempt to repair or maintain the welder while the power is on Inspect all cables and cord...

Page 5: ...lammable or explosive materials are present Remove all flammable materials within 35 feet of the welding arc If removal is not possible tightly cover them with fireproof covers Take precautions to ens...

Page 6: ...ing it Use protective cylinder cap whenever possible 1 5 Proper Care Maintenance and Repair Always have power disconnected when working on internal components Do not touch or handle PC board without b...

Page 7: ...st for your welder The tall second shelf is well positioned for that second welding tool Maybe it is a plasma cutter or a small stick welder This cart allows you to store both welders on one cart The...

Page 8: ...Side Cabinet panel Item 6 into the assembly and align mounting holes with the Vertical Cylinder Securement Panel Item 25 Use two supplied 10 MM bolts to secure the Left Side Cabinet Panel to the Vert...

Page 9: ...nel Item 25 Use two supplied 10 MM bolts to secure the Right Side Cabinet Panel Item 22 to the Vertical Cylinder Securement Panel Item 25 and the base panel Item 13 6 Find the long slots at the back o...

Page 10: ...f the hinge Item 7 and through the pre drilled holes on the front door Item 8 Add a flat washer lock washer and nut onto the back to secure Repeat for the other left side hole in that hinge Item 7 The...

Page 11: ...em 2 Then slide it through the matching pre drilled hole on the left lip of the top shelf Item 1 Add a flat washer lock washer and secure it with a nut Leave this nut slightly loose at this time Repea...

Page 12: ...Page of 14 12 DIAGRAM PARTS LIST...

Page 13: ...1 14 105100029 SCREW 4 2 MM X 9 5 MM 18 15 105100118 10 MM BOLT LONG M6 30 4 15 1 105100046 FLAT WASHER M6 8 15 2 105100045 LOCK WASHER M6 4 15 3 105100053 HEX NUT M6 4 16 105100119 10 MM BOLT SHORT M...

Page 14: ...Page of 14 14 CORNWELL QUALITY TOOLS COMPANY 667 SEVILLE RD WADSWORTH OH 44281 1077 Made in China...

Reviews: