Corning Cable Systems reserves the right to improve, enhance, and modify the features and specifications of
Corning Cable Systems’ products without prior notification.
All trademarks are the property of their respective holders.
Corning Cable Systems is ISO 9001 certified.
© 2006 Corning Cable Systems LLC
All rights reserved.
Corning Cable Systems LLC
PO Box 489
Hickory, NC 28603-0489 USA
For US and Canada 1-800-743-2673
International 828-901-5000
FAX: 828-901-5973
http:www.corning.com/cablesystems
Page 2
SRP-006-083 Issue 7
15
10
Cleave the fiber. The FBC-012 cleaver
is recommended.However, any cleaver
capable of producing quality cleaves
between 8mm and 10mm of bare fiber
can be used.
For the FBC-012 cleaver:
load the fiber
into the handler. Place the handler into
the FBC-012 so that the edge of the fiber
coating contacts the edge of the left-hand
cleaver pad. Do this visually; do not slide the handler over against the stop. While holding the
handler in this position slowly press the cleaver’s handle as far as it will go. Gently release the
handle and remove the fiber handler. Open the handler and remove the fiber.
For the FBC-001 cleaver:
position the marks so that
the buffer coating lines up with the fiber guide’s stop
and the end of the fiber is secured under the spring-
loaded fiber clamp. Press down the cleaver arm until it
touches the fiber guide. This will "score" the fiber. Only
light pressure is necessary. Release the cleaver arm, then
gently flex the fiber guide to break the fiber. If the fiber
guide is flexed excessively to break the
fiber, a poor cleave will result.
Once the fiber is cleaved, do not clean the fiber, or allow it to contact anything. If the cleave does contact something, start again.
6
14 11
14 11
11 14
11 14
Blade
Bare fiber
end
Stop
FBC-012
FBC-001
900
µ
m Tight-buffered
250
µ
m Fan-out
Coated fiber edge
Bare fiber
Visual mark
Release button
25.4 mm (1 in.)
minimum
900
µ
m
Press the roller release button and load
the buffered fiber between the rollers.
7
Press the release button and lift straight
up to remove fiber.
2
1
212
97-0
8
UC
Key
U
P
ST-
compatible
FC
LC
SC
MT-RJ
Date
beveled
edges
Depending on the connector type, add the appropriate hardware, additional strain relief,
and connector boots.
• FC, ST, and MT-RJ slide boot onto connector.
• SC connectors slide boot onto connector then insert connector into housing with the
housing "key" and connector "date code" aligned.
• LC connectors install the trigger before sliding boot onto connector.
4
1
P U
Insert the fiber into the lead in tube.
The visual mark on the fiber must
be within 2 mm of the lead in tube.
8
2 mm
Visual mark
Front of tool
Use the rollers to apply inward pressure on the
fiber so a
slight
bow forms for 1.6, 2.0, or 2.9 mm
applications; form a 12 mm (0.5 in.) bow
for 900
µ
m applications.
9
Rotate the crimp handle 180
°
until it
contacts the lead in tube. Push the
handle down firmly and lift it back up.
1
1
Crimp handle
Move the slider handle back and
lift out the connector.
3
1
>90
°
Rotate the wrench handle down 90
°
to cam the connector.
0
1