12
EDGE Floorbox for installation in raised floor
Content
1. General
1.1
Carton contents
1.2
Tools required
1.3
Accessories (available separately)
2. Box installation
2.1
Floor installation
2.2
Raised floor installation
3. Installation
3.1
Trunk cable installation
3.2
EDGE modules installation
3.3
Patch cables installation
4. EDGE modules removal
Warning!
Possible laser/LED radiation in the non-visible spectrum!
Never look into open fiber ends if the level of risk from laser/LED radiation is not known.
Important
The assignment of the risk level must be specified definitively by the site technician/operator responsible for the
communications facility and must be indicated accordingly (e.g. by attaching standard-compliant warning signs as per
the current edition of DIN EN/IEC 60825-1, and in accordance with the current edition of BGV B2 “Laser radiation”).
If there is any change in the technical data relating to the risk level, the warnings must be adapted accordingly and
occupational safety precautions must be taken if required, see also e.g. the current edition of DIN EN/IEC 60825-2.