![CORNING EDGE 1U Manual Download Page 3](http://html1.mh-extra.com/html/corning/edge-1u/edge-1u_manual_2668549003.webp)
Standard Recommended Procedure 003-794-AEN | Issue 14 | March 2020 | Page 3 of 27
4.
Installation
4.1
Rack or Frame Mounting
Step 1:
Identify the position on the rack where the housing will be installed and partially install screws to rest
the mounting brackets on Figure 2.
Step 2:
Move brackets forwards or backwards for desired frontal projection and rest the mounting brackets
behind the screw heads just installed in the rack.
Step 3:
Install screws into the rack through the mounting brackets.
Step 4:
If installing a 2U or 4U housing, slide the fiber management fingers onto the housing.
NOTE:
Installation of fiber management fingers is essential to ensure proper jumper management.
4.2
Install Trunk Cables
The EDGE™ Trunk Cable is supplied with factory-installed protection/pulling grips (Figure 3) to protect the
connectors and their fibers by coupling the pulling load back to the cable. The cradle is used to install the
furcation plug into the housing.
Figure 2 — Rack or Frame Mounting
Figure 3 — Cable with Pulling Grips