Loose Tube Fiber

Tight-buffer Fiber

Protect tight-buffer fiber with braided tubing, if

needed, for multiple cables or 24-fiber cables.

TPA-3950

10

Store up to 38 inches of cable slack under cassette.

3. 

SPLICe CaSSeTTe (CCH-CS) INSTaLLaTIoN — RIBBoN FIBeR

3.1. 

Ribbon Fiber Preparation and Routing

35 inches

Ribbon Pigtail

TPA-3936

Protective tubing is required

for ribbon splicing application.

NOTE:  Ensure length of pigtail is 

             approximately 35 inches

             from fan-out body.

9 inches

Ribbon Pigtail

TPA-3937

1

Cut 9 inches of protective tubing.

2

CRITICAL STEP:

Slide tubing onto ribbon

up to the fan-out body.

Summary of Contents for CCH-CF

Page 1: ...if focused with optical instruments Should accidental eye exposure to laser light be suspected arrange for an eye examination immediately CAUTION Recommend the use of safety glasses spectacles confor...

Page 2: ...s of fiber stick to your clothing or drop in the work area where they can cause injury later Use tweezers to pick up cleaved or broken pieces of glass fibers and place them on a loop of tape kept for...

Page 3: ...SSUE 1 October 2011 PAGE 3 OF 11 2 2 Cable Preparation TPA 3930 5 TPA 3931 6 7 8 TPA 3932 9 10 62 inches 48 inches 82 inches 48 inches Strip Lengths for Splicing Strain relief Point TPA 3951 1U 2U 3U...

Page 4: ...g Tight Buffer or Loose Tube Fiber Cut to 48 inches 250 micron 35 inches 900 micron 1 2 3 TPA 3933 5 6 4 TPA 3934 Repeat Step 5 on the other side of cassette Loop and store all fiber under flanges Fol...

Page 5: ...inches of cable slack under cassette 3 Splice Cassette CCH CS Installation ribbon fiber 3 1 Ribbon Fiber Preparation and Routing 35 inches Ribbon Pigtail TPA 3936 Protective tubing is required for rib...

Page 6: ...D PROCEDURE 003 895 ISSUE 1 October 2011 PAGE 6 OF 11 1 2 TPA 3928 TPA 3938 5 6 7 Capture fibers and ribbon under flanges TPA 3939 TPA 3839 8 10 Press plungers to install adapter panel 9 Ensure slack...

Page 7: ...hown for ribbon fiber splices 3 3 Splcing Preparation Single fiber Orientation Mass Fusion Ribbon Orientation TPA 3949 90 TPA 3940 TPA 3840 1 4 2 Rotate splice organizer 90 for ribbon storage 3 Flex o...

Page 8: ...hrink tube Route ribbon to bottom layer 11 12 13 Place ribbons in tube secure with cable tie Route as shown Splice per the instructions provided with the splice equipment Cut ribbons in center of orga...

Page 9: ...RD RECOMMENDED PROCEDURE 003 895 ISSUE 1 October 2011 PAGE 9 OF 11 4 Slack Cassette CCH CF Field Termination Loose Tube or Ribbon Cable 5 Slack Cassette CCH CF Field Termination Tight Buffer Cable TPA...

Page 10: ...tion in CCH 01U CCH 02U or CCH 03U Closet Connector Housing TPA 3943 Slide covers apart to remove Remove Open front and back doors 8 Routing Guides 1 Strain relief Bracket 2 Blank Panels 4 Panel Clips...

Page 11: ...tions of Corning Cable Systems products without prior notification All trademarks are the properties of their respective owners Corning Cable Systems is ISO 9001 certified 2011 Corning Cable Systems A...

Reviews: