CORNING CCH 1U Quick Start Manual Download Page 3

STANDARD RECOMMENDED PROCEDURE 003-876-QSG | ISSUE 2 | 

OctOber

 2011 | PAGE 3 OF 6

4.2.  sheath retention

4.3. 

Strain-relieving to the Transitional Strain-Relief Holder

TPA-3877

Bundle of small 

diameter cable:

Cable tie bundle together,

then cable tie to all 4 bridges

Small diameter cable:

Cable tie to 2 bridges

Large diameter cable:

Cable tie to all 4 bridges

TPA-3883

4.3a

4.3a

4.3a

Replace blank panels with adapter 

panels applicable for the 

connectors being used.

4.3b

Press buffer tube 

fan-out bodies into 

transitional holder. 

OR Secure loose tube 

cable to the transitional

holder with cable ties. 

4.3c

In 2U or 3U housings, 

you may stack the 

transitional holder to 

accommodate more

fan-out bodies or cables. 

Reviews: