ONE SD-LAN Head
End Equipment
Quick Installation Guide
SD-LAN-000-HEEQUIP
| Page 12
Qucik Installation I SD-LAN-000-HEEQUIP
8 Fiber Set Up |
8.1 Fiber Hardware Housing Set Up
METHOD A. Unicam® Connector
METHOD B. Fuselite® Connector
Step 1
Step 2
Mount selected fiber hardware
enclosure in Head End equipment
rack
Insert selected fiber panels or
cassettes into housing
CCH-01U 2 CCH Panels/Cassettes
CCH-02U 4 CCH Panels/Cassettes
CCH-03U 6 CCH Panels/Cassettes
CCH-04U 8 CCH Panels/Cassettes
NOTE: Outgoing fiber cables can be terminated using
the following methods
A. Unicam® Connectors
B. Fuselite® Connectors
C. CCH Pigtailed Splice Cassettes
Step 1
Step 1
Step 2
Step 2
Step 4
Step 5
Step 3
Step 3
Step 4
Step 5
Step 6
Step 7
Use CCH panels to interconnect
Head Equipment and outgoing fiber
cables
Use CCH panels to interconnect
Head Equipment and outgoing fiber
cables
Insert CCH panels into fiber housing
Insert CCH panels into fiber housing
Plug terminated Fuselite®
connectors into the back of the CCH
panels
Route fiber in back of CCH housing
making sure the minimum bend
radius is not exceeded and
fibers are not pinched or damaged
Terminate fiber using Corning
Fuselite® standard recommended
procedure
catalog/coc/documents/standard-
)
Terminate outgoing fiber using
Corning Unicam® standard
recommended procedure
catalog/coc/documents/standard-
recommended-procedures/006-369.
)
Plug terminated Unicam connectors
into the back of the CCH panels
Route fiber in back of CCH housing
making sure the minimum bend
radius is not exceeded and
fibers are not pinched or damaged
Make sure outgoing cables are
routed and strain relieved properly to
housing
Connect jumpers from Head End
Active equipment to the appropriate
port on CCH panels