background image

 

ONE SD-LAN Head
End Equipment
Quick Installation Guide

SD-LAN-000-HEEQUIP

 | Page 12

Qucik Installation I SD-LAN-000-HEEQUIP

8  Fiber Set Up |

8.1 Fiber Hardware Housing Set Up

METHOD A. Unicam® Connector

METHOD B. Fuselite® Connector

Step 1

Step 2

Mount selected fiber hardware 

enclosure in Head End equipment 

rack

Insert selected fiber panels or 

cassettes into housing

CCH-01U        2 CCH Panels/Cassettes

CCH-02U        4 CCH Panels/Cassettes

CCH-03U        6 CCH Panels/Cassettes

CCH-04U        8 CCH Panels/Cassettes

NOTE: Outgoing fiber cables can be terminated using 

the following methods

A. Unicam® Connectors

B. Fuselite® Connectors

C. CCH Pigtailed Splice Cassettes

Step 1

Step 1

Step 2

Step 2

Step 4

Step 5

Step 3

Step 3

Step 4

Step 5

Step 6

Step 7

Use CCH panels to interconnect 

Head Equipment and outgoing fiber 

cables

Use CCH panels to interconnect 

Head Equipment and outgoing fiber 

cables

Insert CCH panels into fiber housing

Insert CCH panels into fiber housing

Plug terminated Fuselite® 

connectors into the back of the CCH 

panels

Route fiber in back of CCH housing 

making sure the minimum bend 

radius is not exceeded and

fibers are not pinched or damaged

Terminate fiber using Corning 

Fuselite® standard recommended 

procedure

(

https://www.corning.com/

catalog/coc/documents/standard-

recommended-procedures/LAN-

1468-AEN.pdf

)

Terminate outgoing fiber using 

Corning Unicam® standard 

recommended procedure

(

https://www.corning.com/

catalog/coc/documents/standard-

recommended-procedures/006-369.

pdf

)

Plug terminated Unicam connectors 

into the back of the CCH panels

Route fiber in back of CCH housing 

making sure the minimum bend 

radius is not exceeded and

fibers are not pinched or damaged

Make sure outgoing cables are 

routed and strain relieved properly to 

housing

Connect jumpers from Head End 

Active equipment to the appropriate 

port on CCH panels

Summary of Contents for 1LAN-QSFPP-40GB-LR

Page 1: ...llowing items are required for installing the Head End Equipment ONE SD LAN Head End Equipment Accesories 1LAN SRV 50195L Virtual Application Host SDDP 48 Port Switch 4 Port OLT 8 Port OLT Power Suppl...

Page 2: ...R 1LAN SFPP 10GB S 1LAN SFP 0035 1LAN OA UPC LC UPC to LC UPC Simplex Jumper xxx length in ft 020201R2131xxxF LC UPC to LC UPC Duplex Jumper xxx length in ft 020202R5131xxxF LC UPC to SC APC Simplex J...

Page 3: ...s Closet Connector Housing 4RU 12 Panels Cassettes Connector Panel 6 fiber SC APC Splice Cassette 6 fiber SC APC Connector Panel 12 fiber SC APC Splice Cassette 12 fiber SC APC Connector Panel 6 fiber...

Page 4: ...e SD LAN 000 HEEQUIP Qucik Installation I SD LAN 000 HEEQUIP CCH UM1 6CD6CE1116 CCH UM1 22D22E1116 CCH UM1 6CD6CE1132 CCH UM1 22D22E1132 1x16 Splitter SC APC 1x16 Splitter LC APC 1x32 Splitter SC APC...

Page 5: ...Panel NOTE Above is a suggested layout for the Head Equipment in rack Specific deployments may require different layouts of equipment p n CCH 04U CCH 03U CCH 02U CCH 01U Power Supply Unit OLT p n 1LA...

Page 6: ...t into the copper SFP in the SDDP TOR switch Connect Micro USB end of console cable coming from the back of Virtual Application Host to the Console port on the front of the SDDP TOR To SDDP TOR Consol...

Page 7: ...other end of jumper to corresponding Application Controller To Application Controllers SFP SFP 4 Virtual Application HOST SDDP Top Of Rack TOR Switch Sat Up Using External Router 4 1 Virtual Applicati...

Page 8: ...st into the copper SFP in the SDDP TOR switch Connect Micro USB end of console cable coming from the back of Virtual Application Virtual Application Host to the Console port on the front of the SDDP T...

Page 9: ...f Active Ethernet topology is being utilized the SDDP TOR switch can be used to directly feed Access Nodes if empty ports are available on the TOR If empty ports are not available an SDDP Aggregation...

Page 10: ...lable port on SDDP TOR switch Using an LC UPC LC UPC Duplex jumper connect the SFP in the TOR switch to the SFP in the Aggregation Switch Insert a Bi Di Fiber SFP 1LAN SFP 4305BC into an open port on...

Page 11: ...into available port on OLT 7 Power Set Up NOTE For detailed instructions on mounting and installing PSU6 see Coring Quick Installation Sheet CMA 477AEN NOTE The DE2 CCA 1PR18 2M assembly is used for 7...

Page 12: ...to interconnect Head Equipment and outgoing fiber cables Insert CCH panels into fiber housing Insert CCH panels into fiber housing Plug terminated Fuselite connectors into the back of the CCH panels R...

Page 13: ...e CCH Pigtailed Splice Cassettes to interconnect Head Equipment and outgoing fiber cables Terminate fiber in CCH Splice cassette using Corning standard recommended procedure http csmedia corning com o...

Reviews: