Pinnacle Hot Gas Valve Replacement Installation Instructions
Publication Number: 629091023INS
- 6 -
© 2007-2013, IMI Cornelius Inc.
10. Carefully mark the tube-cut locations on the hot gas valve inlet at 1-5/8” up from the copper hot gas
header, as shown Cut hot gas valve inlet line with imp tubing cutter.
Figure 9.
11. Remove hot gas valve assembly.
Step1
Step 2
Figure 10.
1
‐
5/8”
Summary of Contents for FCB Pinnacle
Page 13: ......