background image

FCB Ice Probe Supplemental Harness Installation Instructions

Publication Number: 629088376INS

- 2 -

© 2003, IMI Cornelius Inc.

5.

Disconnect the connector J18 from the Main Control 

Board. 

6.

Using the provided White/Blue Harness, connect 

the Male end to the Main Control board at J18 and 
the Female end to the Male end of the main unit 
harness J18.

7.

Replace the screws that hold the control box door closed.

8.

Switch the power to the unit on. After the unit runs through the initialization, turn both barrels on. 

Verify that the unit starts to refrigerate the barrels by drawing enough product to cycle the blendona-
tor.

Main Board 
Connection 
J18

Main Unit 
Harness J18

Reviews: