Cooper NSSFMV Series Operating Instructions Download Page 3

Page 2 of 3 

IM0086. Revision 6     05/2016                                          Cooper Electric (Changzhou) Co., Ltd. 

6. Type configuration

 

Std. Catalog No. 

Watt 

(W) 

Lamp 

Voltage 

T Class (Gas) 

 (Dust) 

Weight 

(Kg) 

Note: 
HPS=high 
pressure sodium 
vapour lamp 
MH=high pressure 
metal halide 
T=Tube shape 
E=Bulb shape 

 Type  Shape 

+40ºC  +45ºC  +50ºC  +55ºC  +40ºC  +45ºC  +50ºC  +55ºC 

NSSFMVSY150/**** 

150  HPS 

T/E 

220V 50Hz 

230V 50Hz 

240V 50Hz 

220V 60Hz 

230V 60Hz 

240V 60Hz 

T4 

T4 

T3 

T3 

125 

130 

135 

140 

12 

NSSFMVMY150/**** 

150 

MH 

T/E 

T4 

T4 

T3 

T3 

125 

130 

135 

140 

12 

NSSFMVSY250/**** 

250  HPS 

T/E 

T3 

T3 

T3 

T3 

160 

165 

170 

175 

13 

NSSFMVMY250/**** 

250 

MH 

T/E 

T3 

T3 

T3 

T3 

160 

165 

170 

175 

13 

NSSFMVSY400/**** 

400  HPS 

T/E 

T3 

T3 

T3 

183 

188 

193 

15 

NSSFMVMY400/**** 

400 

MH 

T/E 

T3 

T3 

T3 

183 

188 

193 

15 

NSSFMVMY400H/****  400 

MH 

T/E 

T3 

T3 

T3 

183 

188 

193 

15 

If the cable glands included in the scope of 
delivery are replaced with other cable glands, the 
“nR” properties must be checked before putting 
into operation. 

 

Restricted breathing test may be carried out 
as per section 11. 

 

7.4 Opening/closing the floodlight 

 

7.4.1 General 

 

The opening of floodlight always shall be 
without voltage!  
All gasket seals must be clean and 
undamaged before closing the floodlight. 
Make sure the floodlight is well closed before 
operation! 

 

Unscrew all screws in the glass frame and lift 
the protective glass to one side. 
Unscrew the terminal compartment cover and 
remove the terminal compartment cover. 
Carry out the steps in reverse order to close the 
floodlight and Check all screws to ensure a 
secure fit (Torque for screws: 2.5 Nm). 

 

7.5 Electrical connection 

 

The electrical connection of the lamp must 
only be established by qualified electricians. 
Make sure the supply voltage is the same as 
the luminaire voltage!  
Use proper supply wiring as specified on the 
nameplate of the luminaire and in this 
instructions! 
Excessive tightening may affect or damage 
the connection. 

Only heat resistant cable according to the data 
on the type label may be used for the electrical 
installation! 
Connect cable according to the terminal 
numbering and circuit diagram. 
The conductors shall be connected with special 
care in order to maintain the explosion category. 
Leads connected to the terminals shall be 
insulated for the appropriate voltage and this 
insulation shall extend to within 1mm of the metal 
of the terminal throat. The conductor itself shall 
not be damaged. The connectible min. and max. 
conductor cross-sections shall be observed (see 
technical data). All terminal screws, used and 
unused, shall be  tightened  down 

(Torque for 

terminal screws: 1.2~2 Nm for MK/6). 

Main connection: See wiring diagram. 

 

7.6 Lamp mounting 

 

Only must be mounting appropriated lamps 
for the supplied floodlight see indications on 
the nameplate of the floodlight and in this 
instructions!  

See section 7.4 for notes on opening and closing 
the lamp. The lamp must be screwed tightly into 
the lampholder.  
Ensure it is screwed in fully so that no sparks or 
other unauthorized operating states may occur. 
Protect the glass on the lamp from breaking 
when screwing in. 

The improper installation and operation may 
result in the explosion protection and 
invalidation of the guarantee. 

 

7.2 Mounting the floodlight 

 

7.2.1 Mounting the bracket 

 

Only use the accompanying mounting bracket! 
Use M12 bolts, plain washer and spring washer 
to securely fasten the Trunnion bracket to a 
suitable base with sufficient load-bearing 
capacity. See Fig.1 and Fig.2 for detail. 

 

7.2.2 Pole mounting 

 

The pole adapter is not included in the lamp's 
scope of delivery and is available as an 
accessory. Screw the floodlight mounting bracket 
to the pole adapter as shown in Fig.1. 
The pole adapter can be mounted onto a 2” pipe. 
Secure the pole adapter using the four clamping 
screws (62Nm,see Fig.2). 
The connection cable may not be damaged in 
the process. An explosion protected cable 
gland(not included in the scope of delivery)can 
be screwed into the pole adapter, enabling the 
pole to be used for cable routing (see Fig.2). 
The connection cable must not be damaged 
in the process. 

 

7.2.3 Wall bracket mounting 

 

The wall bracket is not included in the lamp's 
scope of delivery and is available as an 
accessory.  
Use appropriate screws, spring washers and 
grommets to secure the wall bracket to a  
suitable wall at the four drilled holes (see Fig.3). 
Slide the floodlight with the pole adapter onto  
the pipe of the wall bracket and secure with the 
four clamping screws (max.62Nm). 

 

7.2.4 Vertical adjustment of floodlight 

 

Loosen the two pivot bolts on the floodlight yoke 
to position floodlight at the desired tilt angle 
(within the acceptable aiming range limits). See 
Fig.4. Re-tighten the adjustment screws(26Nm). 

 

The lamp must not be illuminated when at a 
distance of less than 0.5m from inflammable 
material.

  

 

7.3 Cable entries/blanking plugs 

 

The “restricted breathing(Ex nR)" properties  
must be preserved when, for example, using 
cables and wires of sufficient diameter(see also 
IEC/EN 60079-14). Unused holes shall be  
closed with certified blanking plug in order to 
establish the protection category. The cable 
glands and blanking plugs must be used in 
compliance with IEC 60079-31. The authoritative 
mounting guideline for the cable glands used 
must be observed.

 

Mounting the selected cable 

entries(cable glands) acc. type and dimensions 
of the main connection cable and following their 
manufacturer instructions. The cable glands and 
blanking plugs should be at least Ex nR certified, 
and should be also Ex tb certified if the whole 
product is Ex tb certified also. 

7. Installation 

  

7.1 General 

 

The respective national regulations IEC/EN 
60079-14 as well as the general rules of  
engineering which apply to the installation 
and operation of explosion protected 
apparatus will have to be observed! 

Reviews: