Cooper Lighting Sure-Lites LEM Installation Instructions Download Page 2

SURE-LITES

LEM 

page 2

OPERATION

Depress the test switch. The LED heads will light and the charge LED will extinguish. LED heads will illuminate as long as the button is 
pushed. Release the test switch. The charge LED will illuminate and the LED heads will turn off. 

MAINTENANCE: 

None required. Replace the batteries as needed according to ambient conditions. However, we recommend that the

                                 equipment be tested regularly in accordance with local codes. 

 

                                                  

NOTE:

 Servicing of any parts should be performed by qualified personnel. Only use replacement parts supplied by Cooper Lighting

 Solutions

.

CAUTION: 

This equipment is furnished with a sophisticated low voltage battery dropout circuit to protect the battery from over discharge after its 

useful output has been used. Allow 24 hours recharge time after installation or power failure for 90 minute testing.

TROUBLE SHOOTING GUIDE 

If LED heads or charge indicator LED does not illuminate, check the following:

1.

Check AC supply – verify that unit has 24 hour AC supply.

2.

Unit is shorted or battery is not connected.

3.

Battery discharged. Permit unit to charge for 24 hours and then re-test.

4.

If following the above trouble shooting hints does not solve your problem, contact your local Cooper Lighting 

Solutions 

representative for

assistance.

SCHEMATIC 

JMP12

JMP11

JMP10

JMP9

JMP8

JMP7

JMP6

JMP5

JMP4

BATT

LAMPS

N

c

TDI

ICSP

277

JMP13

JMP14

LED/SW

D5

C6

C7

C8

C9

CN4

F1

J1

JK1

LED1

MOV1

MOV2

PR1

Q1

Q5

R7

R10

R13

R15

R18

R30

SW1

120

CN5

+

+

WHITE LEAD - TO NEUTRAL

BLACK LEAD - TO 120V

ORANGE LEAD - TO 277V

CHARGER/DRIVER PCB

BATTERY

LED HEADS

Cooper 

Lighting Solutions 

1121 Highway 74 South  

Peachtree City, GA  30269  

770.486.4800  Fax: 770.486.4801 
7/20/12 

049-220

Reviews: