5
aSSEMBLY INSTRUCTIONS
1. Stand left hand and right hand walls
upright, facing each other with the
brackets on the inside, two at the
bottom end and one at top end.
(Refer Fig. 1)
2. Insert 2 girders into the bottom
brackets to secure side walls into place.
(Refer Fig. 1)
3. Attach 1500mm water tube to water
inlet in bottom cooling block and the
80mm tube to the water outlet.
(Refer Fig. 2)
4. Place bottom cooling block on top of
girders ensuring the water connectors
are on the underside and at the back of
the dog house. (Refer Fig. 3)
5. Slide corner post assemblies into
position. The short post should be on
the front right hand side of the Dog
House. Ensure the remaining posts are
positioned so that the top angles can be
aligned to the slope of the roof.
(Refer Fig. 4)
6. Attach support blocks to align with the
holes at the base of the corner posts
and fasten into place with 4 screws.
Ensure the short support block is at
front right hand side. Insert feet at
bottom of corner posts. Height adjustor
attaches to front right hand corner post.
(Refer Fig. 5)
Fig. 1
Fig. 3
Fig. 4
Fig. 5
Fig. 2
1500mm water tube
Underside of bott
om
cooling block
80mm
water tube