![Cookson Speedline Technologies Electrovert Bravo 8105 Preventive Maintenance Manual Download Page 57](http://html1.mh-extra.com/html/cookson/speedline-technologies-electrovert-bravo-8105/speedline-technologies-electrovert-bravo-8105_preventive-maintenance-manual_2660435057.webp)
. . . . .
M O N T H L Y P R E V E N T I V E M A I N T E N A N C E P R O C E D U R E S
Inspect Chamber Seal
2-9317-373-00-0
Bravo™ 8105 Preventive Maintenance Guide
5-43
Inspect Chamber Seal
Introduction
The gasket between the upper and lower chambers must provide a tight seal for
optimal reflow operation. Inspect the seal monthly — approximately every 170
hours of operation — to ensure that the gasket provides a continuous seal.
Procedure
Close the chamber on the Bravo™ 8105. Visually inspect the seal to ensure that
there is a continuous seal around the perimeter of the chamber. Refer to
Figure 5–4. It should be free of voids or indentations and thoroughly affixed to
the machine surface.
Photograph
Figure 5–4