Asymptote
St John’s Innovation Centre, Cambridge, CB4 0WS
5.
Getting started
Before switching on
1.
Site the Thawer on a suitable table or work-surface. Keep thawer and PSU away
from liquids, and maintain good access to device and building electrical supply
sockets.
2.
The outlet vents for fluids from condensation or ice thawing and the loudspeaker
are on the bottom so ensure that the work-surface is firm and free from debris.
Do not run the system on a soft surface such as a carpet.
3.
Plug the supplied IEC C5 cable into the supplied PSU and the 5.5mm DC jack into
the Cook VIA Thaw. The PSU used MUST be the 24VDC 3.75A LPS SELV variant
supplied with the Thawing System.
Attaching to Ethernet
4.
If a wired connection to a local network is required for a my.Cryochain connection,
then plug an Ethernet cable from the local area network into the RJ45 socket at
the back of the Thawer. It is important that the Ethernet in your facility complies
with the ELV directive, or TNV standards to ensure safety.
NOTE:
The Ethernet cable MUST be a screened variety to ensure correct operation.
Introducing the user interface
Display
Indicator
ring