
Role
Skills required
Tasks
Plumber
■
Is an employee of an authorized serv‐
ice company
■
Has relevant professional training
■
Connecting the appliance to the
building's water supply
■
Disconnecting the water connec‐
tion
■
Connecting the appliance to the
building's wastewater system
■
Disconnecting the wastewater sys‐
tem
Start-up engineer
(Service engineer)
■
Is an employee of an authorized serv‐
ice company who has overall respon‐
sibility for preparing the combi oven
for first-time use
■
Has relevant technical training
■
Is trained in the particular appliance
■
Knows the regulations associated
with handling heavy loads
■
Can assess whether the electrical,
gas and water supplies and the
wastewater system have been con‐
nected correctly.
■
Instructing the owner and/or mem‐
ber of staff with relevant responsi‐
bility
■
Checking the work procedures and
status values against the check‐
lists
Working positions when installing the appliance and putting the appliance into service
The working position for personnel installing the appliance and putting the appliance into service is the
entire appliance area.
3 For your safety
42
Summary of Contents for 4 10.10
Page 1: ...Combi oven Read instructions before use Convotherm 4 Installation manual Original ENG...
Page 2: ......
Page 190: ......