September 10, 2020 | 296742-ENG R00 15
4
MAINTENANCE
The chamber requires regular maintenance in order to continue performing to specifications.
Ensure reliable performance from your Conviron equipment by following the recommended
maintenance routines and minimize the need for service.
Refer to the included
Conviron Chambers Maintenance and Troubleshooting Manual
for complete
information on recommended cleaning solutions and frequency, and for the maintenance
procedures listed in Table 4-1.
4.1 Maintenance Schedule
Table 4-1 identifies the frequency of required maintenance.
Table 4-1
Maintenance Schedule
Standard Features
Prior to New
Experiment
Daily
Monthly
Semi-
Annual
Temperature, Humidity, CO
2
Processes & Lamps
Circulating Fans, Intake and Exhaust Ports,
Fresh Air Inlet Filter
Interior
Sight Glass
Drain Pan & Strainer, Canopy Cables
Refrigeration Faults, Water Supply & Drain, Door
Gaskets
Optional Equipment
Before New
Experiment
Daily
Monthly
Semi-
annual
SNH Additive Humidity System
Separate Coil Dehumidifier
Air Cooled Condenser
CO
2
System
Humidity Sensing Unit, Dry Humidity Sensor,
Humidity Transmitter Calibration, Additive CO
2
System