6.
-before placing the enclosure box inside the wall opening, remove the knock out and pass
the electrical wires (fig.6), and the pilot wire if needed, using an appropriate bushing (
not included).
-Insert the enclosure box and secure it to the wall with appropriate hardware (fig 7c)
having taken into account the reassembly of the facade. Indeed, leave approximately
1/8“ (3 mm) between the wall and the upper fold of the inner box to facilitate the assembly
of the facade (see fig. 7a et 7b).
-Insert and hook the ventilation block and the control panel inside the enclosure box.
secure the ventilation box with 2 screws (fig.5).
Fig 5
Fig 6
Fig 7a
Fig 7b
Fig 7c
electrical wire
screw
screw
wall
facade
enclosure box