Contura C 685 Installation Instruction Download Page 8

!

C 685

72

GB

615

300

  70

750

800

800

Fire-retardant wall of
brick or concrete

800

520

250

100

100

200

300

400

175

275

375

475

Combustible wall

400

700

1200

120* (520)

200

50

Fire-retardant wall of
brick or concrete

640

325

  95

785

Combustible wall

D 360

E 1060

B 1060

A 1190

C 400

220

480

40

Air inlet Ø64

Ø150

 2100

555

1260

Ø580

Air inlet Ø64

Combustible roof

*    If the stove is placed on a hearth plate made of glass for example (accessory), the height from the floor is affected by a distance corresponding to the thickness of the hearth plate. Also applies to  

 

 separate 

glass hearth plates (accessory).

**  To prevent discolouration of painted non-flammable walls we recommend that the same side distance as to combustible walls is used.

The minimum distance in front of 
the stove opening to combustible 
parts of the building or interior 
decoration must be at least 1 m.

When top connecting a steel flue, 
please refer to the particular 
manufacturer's installation 
instructions. Observe the safety 
distance to combustible material 
required by the steel flue  

Installation distances 

WHEN INSTALLING TURNTABLE (OPTION) 

the 

following installation distances do not apply. 
See the separate turntable installation instruc-
tions.

A =  height from floor to chimney    

  connection upwards

B =  height from floor to c/c chimney  

  connection rear

C = height from floor to air inlet
D = height from floor to lower edge  

  of hatch

E = height from floor to upper edge  

  of hatch

A separate glass hearth 
plate (accessory) 
increases the connection 
height to the chimney 
by 10 mm. The spacers 
supplied with the hearth 
plate are installed on the 
stove before connection.

INSTALLATION DISTANCES

Permitted 

area for 

combustible 

parts of the 

building

Summary of Contents for C 685

Page 1: ...www contura eu C 685 Installation instruction...

Page 2: ...LARED PERFORMANCE Essential characteristics Performance Harmonised technical specification Reaction to fire A1 WT Minimum distance to combustible material 100 mm to rear 520 mm to side Other safety di...

Page 3: ...installation instructions carefully before installation Read how to best light your stove in the lighting instructions The stove becomes very hot During operation certain surfaces of the stove become...

Page 4: ...arried out by an authorised technician Contact one of our dealers who can recommend suitable fitters Building permission These main insructions may give guidance which would contravene national buildi...

Page 5: ...by turning it to the left until it slides free from the lower set of screws holding the legs in place Handle the vermiculite with care Lift the smoke baffle with one hand whilst removing the sides pi...

Page 6: ...or connecting to chimneys dimensioned for 350 C flue gas temperature The external diameter of the connection sleeve is 150 mm The stove requires a draft in the chimney of at least 12 Pa The draft is a...

Page 7: ...spondingly larger wall vent must be selected In hot areas the duct should be insulated with 30 mm mineral wool covered with a moisture inhibitor plastic It is important that the lead in between the pi...

Page 8: ...nce in front of the stove opening to combustible parts of the building or interior decoration must be at least 1 m When top connecting a steel flue please refer to the particular manufacturer s instal...

Page 9: ...2 1 73 GB The pillar is mounted using four screws The remaining four screws must also be reinstalled to prevent air leakage into the firebox Installing C 685 ASSEMBLY...

Page 10: ...3 13 VANADI UM No 7 CHROME 5 4 3 74 GB Clean the side glass thoroughly before installing the side panels Do not tighten the screws until the insert has been raised from the pallet and is level ASSEMBL...

Page 11: ...king oven according to the instructions in the section for the relevant accessory on pages 77 to 79 This must be done before the stove top is installed Adjust the side panels so that they are against...

Page 12: ...d by an authorised chimney sweep before the stove is used Also read the Lighting instructions before lighting for the first time Final inspection of the installation Installing rating plate Position t...

Page 13: ...ght of the baking sheet by turning the adjusting screw at the bottom of the oven unit Hold the oven door in place on the threaded pin Hook the top hinge in place and loosely tighten one of the screws...

Page 14: ...adjuster screws provided Place the warming shelf in the heating compartment use the adjuster screw at the rear edge for horizontal installation In the side of the heating compartment there is a small...

Page 15: ...2 2 1 1 79 GB Installation of soapstone warming shelf option Installing convection fascia option ASSEMBLY...

Page 16: ...E AB Box 134 285 23 Markaryd Sweden www contura eu Contura reserves the right to change dimensions and procedures described in these instructions at any time without special notice The current edition...

Reviews: