background image

To power the eNode

DO

 you 

need a 24V (AC/DC) power 
cable. This can be newly 
installed in any electrical cable 
using a standard 220V>24V 
transformer, or can be found on 
site as often available in the 
technical rooms.

eNode

DO

 is studied to 

interrupt any signal or current 
on a SINGLE PHASE.

 

Therefore, isolate and cut the 
single wire that needs to be 
interrupted and controlled 
remotely and connect with the 
Relais-wires of the eNode.

Press the power button all the 
way down.
The eNode will start to power 
on.

 Only after 30-40 seconds, 

the LED will switch on

.

Secure the eNode to a good and 
protected location using zip-ties 
or strong tape.

Examples of possible use:

- signal to turn on boilers
- signal to turn on lights
- power cable to power ventilation
- power cable to power lights
etc.

Power the eNode with 
a 24V power source

Connect  the  eNode 
with  the  cable  to 
interrupt

Power on the
eNode

Fix  the  eNode  on  a 
firm surface

INSTALLATION IS 

NOW COMPLETE!

1

2

3

4

3

4

2

1

1

st

 Issue

11/19

3

DIM

3

10

e

Reviews: