4.
If not stated otherwise in the instructions for the start up of the vessel, the control
valve must open in such a way that the pressure does not rise more than 5 bar per
minute and the temperature does not exceed the value stated for the start up of the
vessel. Avoid sudden changes in pressure or temperature as they can cause unfavou-
rable tension.
5.
Always watch the vessel, valves and fittings during the start up of the system. If a
problem occurs, e.g. leaks or cracks, the vessel has to be closed down immediately.
6.
During transport vessels must not be under pressure and they must not contain
media
.
7.
When the working pressure is built up, check the vessel and its attachments for
leaks.
D. Operation of the vessels.
8.
The vessel must be closed down immediately,
— if cracks appear,
— if there is a leak in a connection that can be disassembled,
— if there is a safety-equipment failure or defect (e.g. clogging of the safety valve)
or a failure of the level meter etc.,
— when there is immediate danger of an accident or a problem if operation conti-
nue,
— if any other unusual phenomena occur during operation whose causes cannot
be found or eliminated,
— if a deformation on the vessel wall occurs,
— if the temperature exceeds the maximum working temperature,
— in all cases stated in the manual that advise the operator to do so.
Summary of Contents for DBS-25RC
Page 2: ......
Page 5: ...5 ENGLISH CONTRACOR DBS 25 50RC Art 10510 10515 2 Package and description Fig 2 1...
Page 25: ...DEUTSCH 25 CONTRACOR DBS 25 50RC Art 10510 10515 2 Ansicht Arbeitsaufbau Abb 2 1...
Page 43: ...43 CONTRACOR DBS 25 50RC Art 10510 10515 1 44 2 45 3 47 4 49 5 51 6 52 7 54 8 56...
Page 44: ...44 CONTRACOR 1 0 1 1 2 3 4 5 6...
Page 45: ...45 CONTRACOR DBS 25 50RC Art 10510 10515 2 2 1...
Page 47: ...47 CONTRACOR DBS 25 50RC Art 10510 10515 3 3 1 1 2 DMH TWINLINE 3 4 DMH 5 DMH 6 Twinline 1 5...
Page 48: ...48 CONTRACOR 1 0 7 8 9 10 14 2 1 11 FSV 0 12 1 2 13 14 15...
Page 49: ...49 CONTRACOR DBS 25 50RC Art 10510 10515 4 4 1 1 2 3 4 5 12 6 7...
Page 50: ...50 CONTRACOR 1 0 4 2 14 2 1 TWINLINE 1 2 FSV 0 3 4 3 1 2 R 7 3 CAF 0...
Page 51: ...51 CONTRACOR DBS 25 50RC Art 10510 10515 5 5 1 2 1 4 5 4 5 2 1 CAF 0 2 3 3 5 4 1 2...
Page 52: ...52 CONTRACOR 1 0 5 3 160 1 2 6 6 1 1...
Page 53: ...53 CONTRACOR DBS 25 50RC Art 10510 10515 2 3 4 Twinline Twinline RCV 0 RCV 0 TWINLINE...
Page 54: ...54 CONTRACOR 1 0 7 7 1 DBS 25RC DBS 50RC 7 1 DBS 25RC...
Page 57: ...57 CONTRACOR DBS 25 50RC Art 10510 10515 7 8 9 10 11 12 13 14...