![Conti TWIN STAR 2 R-EV 2G Technical Documentation Manual Download Page 8](http://html.mh-extra.com/html/conti/twin-star-2-r-ev-2g/twin-star-2-r-ev-2g_technical-documentation-manual_2656568008.webp)
6
Press many times « MODE » until the right menu to fill up the coffee boilers.
The display shows:
Press ENTER, the machines fills automatically
(during 150sec) the coffee boilers then bleeds the air.
The display shows:
When the coffee boilers are filled.
The display shows again:
Get out from the programming mode, turning the key to the right and turn the machine On
(On/Off button under the machine).
When the machine is ON, the displays show "CONTI", the time, and each coffee group name :
The machine fills automatically the steam boiler.
The display shows:
Put the steam « V » lever down to close the tap.
When the correct water level is reached (SN probe in contact), all the boilers heating up
(coffee and steam) begins.
When a coffee boiler reaches the programmed temperature, all the buttons are lighted: the
machine can make coffee.
When the manometer shows 1.2bar pressure, the buttons « steam SC », « hot water » and
« steam (On / Off)» are lighted, all the functions can now be used.
4.2 Next filling
The TWIN STAR 2 EVOLUTION will manage the automatic filling of the boilers as long hot
water is drawn (water level sensor maximum).
♦
STANDARD PRESSURE - PRESSURE GAUGE:
The steam boiler pressure has been adjusted in the factory between 0.9 and 1.2 bars.
An overheating thermostat will interrupt the boiler heating as soon as the temperature is
increasing abnormally.
THE MACHINE IS READY FOR OPERATION.
CONTI
BBBBBBBB
CONTI HH:mm
AAAAAAAA
Filling
In progress
1° filling
press Enter
1° filling
in progress
Exit from prog
Set on
Summary of Contents for TWIN STAR 2 R-EV 2G
Page 2: ......
Page 43: ...41 10 DIMENSIONS ...
Page 53: ...51 13 HYDRAULIC DRAWING Σ Σ ...
Page 55: ......