background image

POWER FACTOR CONTROLLER

RG-6B/BS/8B/BS/12B/BS

DIMENSIONS

Do not use device without checking terminal connections.

CONTROLS and OPERATIONS

Capacitor values are recognized and saved with “ASEt” operation. For doing this, enter

program menu on the device and find “ASEt” menu. “ASEt” menu includes 2 parameters

which are  

“S-oF” 

and

 “S-on”

.

When 

“S-on”

 is selected and SET button is pressed; the device will find and correct

any connection failures (such as wrong connection at voltage and current inputs) first

and then recognize all capacitor steps. If 10th program (PS-10) is selected, all capacitor

powers will be measured. In other programs, only first capacitor step power is measured

and other capacitor steps are calculated and recorded according to selected program.

If 

“S-oF”

  is selected and SET button is pressed during capacitor recognition, automatic

recognition will be ended.

Note: If there are loads other than compensation on the system, the device may
find the connection after several tries. If the device doesn’t complete the automatic
connection process, it can’t do the step calculation process. In order to have
correct power values for capacitor steps, current and voltage transformer ratios
must be entered correctly. If current and voltage transformer ratios are not entered,
these ratios are assumed to be “1” and capacitor powers are calculated according
to these values (Refer to VT and CT ratio settings).
          If automatic setup is selected as “S-on”, automatic mode starts immediately
without waiting to escape from the menu.
Note: A parameter that is calculated automatically by the device can be changed
by the user.

Automatic Capacitor Recognition and Phase Setup Mode

1

For proper operation, current and voltage connections must be connected as

shown in the connection diagram.

After current and voltage terminal connections, capacitor steps’ connection must

be done according to the connection diagram.

Lastly, computer communication connection must be done.

Do not power-up the device before verifying terminal connections.

1. RG-B/BS Series Connection

a)

b)

c)
d)

Device can detect wrong connection on the way of active power. For correcting connection

fault, automatic setup must be done or suitable phase value must be programmed from “AngL”

menu, which is for programming phasor angle, from transformer menu. When user does

automatic setup (ASEt), device will open and close 3 phase capacitor in 1st step during

correction of connection failure. Sudden changes in loads and nonlinear loads (Thyristor or

triac controlled frequency inverter, UPS etc.) existing, automatic setup may not be done. In

this condition, user should disconnect the device and restart it and make the same operation.

This operation can do with selecting “S-on” under “ASEt” menu. In this case device corrects

the errors and then calculates the capacitor values.If user does not want calculating capacitor

values, selecting “S-oF” parameter provides this.

User must enter capacitor values after entering current and voltage transformer ratios. Capacitor

values can be calculated automatically or maually. Capacitor powers are measured automatically

by entering “S-on” under device’s “ASEt” setting (for details please look Operating Mode

Settings). If 10

th

 program (PS-10) is selected in program menu, all capacitor values are

measured by switching on/off of the capacitors in sequence. In this program, 3 phase capacitors

can be connected as desired according to system requirements. If capacitor steps have been

calculated as in the previous step, this step is not necessary. Selecting other program condition

device only calculate 1st step and other steps will be calculated according to selected program.

Device calculates the capacitor values which will be switched “ON” according to selected

program; so device switches on/off the required steps.

Connection of circuit breaker or automatic fuse between the network and RG-B/BS series

is highly recommended. Circuit breaker must be in close proximity to the device.

All used fuses must be FF type and the current values of the fuses must be 2A or 3A and

6A (Refer to Connection Diagram).

Generator input must be done only when the network is supplied by the generator. Otherwise

device will be switched to the generator position for each generator starts including the

maintaining purpose.

a)

b)

c)

d)

e)

2. Commissioning RG-B/BS Series

Generator Input

When 110-250 V AC connection is connected to device’s generator input, 

“COS1”

position will be passive and 

“COS2”

 will be active. So, compensation will be done

according to target COS2 as long as a voltage is present at generator input.

CONNECTION DIAGRAM

Press SET button and enter “ASEt” menu (“S-oF” is displayed)

Select “S-on” option by using UP/DOWN buttons.

(This parameter should be selected as “ON” in order to start the
Automatic Capacitor Recognition.)

Press SET button in order to activate your selection.

Press SET button 3 sec. and select “Auto” option.

Select “ASEt” parameter by using UP/DOWN buttons.

Operating Mode (Automatic/Manual Mode) Settings

RG-B/BS series has two operating modes which are automatic mode and manual

mode. Operating mode can be selected by selecting 

“A-on”

 (automatic) or 

“A-oF”

(manual) option. Manual mode is used for test purpose. In this mode, capacitor steps

are switched on&off to test the relay outputs of the device. In the manual mode,

capacitor steps are switched on by pressing 

“SET”

 button and also capacitor steps

are switched off by pressing 

“ESC”

 button. Factory set values for switching on (ond)

and switching off (oFd) time is 10 seconds. These time values can be programmed

in the Delay (dELy) menu (Refer to delay time setting). In the manual mode, step

numbers, which will be switched on&off, can be programmed in “Step” menu (Refer

to step number setting). Even if manual mode is selected, after 5 minutes, device

starts to work in automatic mode and continues to operate in automatic mode.

When automatic mode is selected, AUTO/MAN LED lights on continuously.

When manual mode is selected, AUTO/MAN LED blinks.

Warning: Device warns user by blinking (short ON, long OFF) the capacitor steps
which will be switched on. Also device warns user by blinking (long ON, short
OFF) the capacitor steps which will be switched off.
For switching capacitors; voltage inputs must be connected and measured
voltage must be higher than (min. 0.5 times) programmed nominal network
voltage.

*  Current value of 3-Fuses, which are connected to protect the capacitors, is
chosen according to the nominal current value of capacitors.
** At 3 phase 4 wire applications L1 and Neutral must be connected device’s
voltage measurement inputs, at 3 phase 3 wire applications L2 and L3 phases
must be connected. L1 phase’s current transformer must be connected to
current measurement input. If load is unbalanced, current cable which is
nearest value of total average value must be connected to current transformer.
In this condition voltage inputs must be set refer to current. When device
programmed to automatic setup, it will program suitable phase angle. So it
will measure true values and true compensation.
*** Communication terminals are only available in BS models.

Precautions for Safe Use and Installation

This user manual is prepared for quick commisioning and operating
of the device. Please read this manual carefully before commisioning
or operating RG-B/BS series

Maintenance, installation and operation of RG-B/BS series must be performed

only by the qualified technicians.

RG-B/BS series is connected to the network with current transformer. Do not

disconnect the current transformer terminals. If you disconnect them, be sure

to short-circuit or connect them to another parallel load which have low impedance.

In case of failure, dangerously high voltage at the secondary side of current

transformer may cause an electric shock.

Device is suitable only for panel mounting.

Verify terminal connections when wiring.

Do not use this product for any other purpose than its original task.

Do not operate undervoltage.

When device is connected to the network, do not remove the front panel.

Do not open the RG-B/BS series’ housing. There are no user servicable parts

inside it.

Do not clean the device with solvent or similar items. Only clean with a dry cloth.

Electrical equipment should be serviced only by your competent seller.

1)

2)

3)

4)

5)

6)

7)

8)

9)

10)

No responsibility is assured by the manufacturer or any of its subsidiaries
for any consequences arising out of the use of this material.

1)  Panel cut-out dimension must be 91 mm x 91 mm for Type PR19 and 143 mm x
143 mm for Type PR16.
2)  Before installation, remove the mounting brackets.
3)  Mount the device to front panel.
4)  Insert the mounting brackets.
5)  Wire thickness for voltage and current terminals must be 2,5 mm

2

, but it is suitable

for cables which have up to 4 mm

2

 section.

6)  CAT5 cable is recommended for RS-485 input terminal.

Excessive force can damage the device.
Turn the screw into the terminals and tighten until the RG-B/BS series is secured
in place.

     70mm

     79.3mm

90mm

     96mm

96mm

Type PR 19

15

17 18 19 20 21 22

5

6

9 10

6A

Alarm Relay

11 12

C1

C6

C7

C12

23 24 25 26 27

30 31 32 33

N

L3

L2

L1

Fan Relay

13 14

1

2

3

4

Un

V

in

I

in

Generator

Input

110~250 V AC

16

1A

K

L

l

1

k

1

~

~

L2
L3

**

**

Type

 PR16

(144x144)

143

99

121

138.4

143

18

34.5

67

RG-6B/BS
RG-8B/BS

**

**

Voltage Measurement

Input

Auxiliary

Supply

Current Measurement

Input

Generator

Input

Fan Relay

Alarm Relay

RG-12B/BS

RG-6B/BS
RG-8B/BS

TR

B

GND

A

RS485

Reviews: