background image

Cubbi

  

Assembly Instructions

connection.uk.com

Summary of Contents for Cubbi

Page 1: ...Cubbi Assembly Instructions connection uk com ...

Page 2: ...ositions and the choice of this determines the assembly method used The first step in any configuration is the assembly of the Cubbi screens The Cubbi screens come in various sizes dependant on the unit specified On all units the process is the same 1 With the screens unwrapped attach the fixing plates to ends of the screens 2 The screens are then placed parallel to each other and the fixings secu...

Page 3: ...oned at either end of the unit 2 The plinth is now complete and can be set aside Please note that any power cables should be feed through the plinth before assembly 1 With the back unit inverted attach the leg rails to the units using the M8 button head bolts 2 With the foot rails attached to both ends of the back offer up the bench unit and secure with M8 button head bolts 3 The unit can now be p...

Page 4: ...aluminium workrails over the screen supports 4 When joining two workrails together they are linked by inserting joining piece between the two workrails A carriage bolt is then passed through the linked piece into a nut to hold the join securely 5 If the workrail is to be linked with a table then you need to ensure that the tool rail plates with pins are inserted into the work rails before the end ...

Page 5: ...te as shown in step 8a Then take an end cap with hole and affix to workrail plate using bolt shown in step 8b 8b 8a 9 Once all the first level of workrails have been attached and secured the screens can be lowered onto the supports Please note where power units are fitted then the cables should be passed through the screens to the lower levels 10 The second level of workrails is then attached and ...

Page 6: ...ed to the workrail using the pins and tool rail plates which had been previously inserted into the work rail The table top will have the have cams inserted 1 2 3 3 The table is offered up to the pins and these are inserted into the pre drilled holes which locate into the engineered cams within the table top Once the table is in the correct position the pins are secured by turning the cams clockwis...

Page 7: ......

Page 8: ...eet Clerkenwell London EC1V 0NA Tel 020 7253 9877 www connection uk com Head Office Showroom Dogley Mills Penistone Road Huddersfield West Yorkshire HD8 0LE Tel 01484 600 100 sales connection uk com Manchester Showroom The Old Law Library Kennedy Street Manchester M2 4BY connection uk com ...

Reviews: