TrailBlazer/SBC
Users Guide
Document: CTIM-00432
Revision: 0.04
Page 30 of 33
Connect Tech Inc. 800-426-8979 | 519-836-1291
Date: 2018-01-05
Typical Installation
1.
Ensure all external system power supplies are off.
2.
Install the Qseven Module into the MXM connector P9. Be sure to follow the manufacturer’s directions for
proper installation of mounting hardware, heatsink/heatspreader, and any other applicable requirements
from the manufacturer.
3.
Install the necessary cables for application. At a minimum these would include:
a)
Power cable to the input power connector
b)
Connect a video display cable
c)
Keyboard and mouse via USB
d)
SATA or mSATA hard drive
For additional information on the relevant cables, please see the Cables and Interconnects section of this
manual.
4.
Connect the Power Cable to the Power Supply
5.
Switch ON the Power Supply. DO NOT power up your system by plugging in live power.
On-Board Indicator LED’s
The Qseven TrailBlazer/SBC has 13 on-board indicator LEDs.
LED
Description
D7A
GBE 0 Activity LED
D7B
GBE 0 Link LED
D8A
GBE 1 Activity LED
D8B
GBE 1 Link LED
D15
XR17V354 Power Good LED
D20
+12V Power LED
D21
+5V Power LED
D22
+3.3 Power LED
D23
SATA Activity LED
D24
Qseven Reset LED
D25
Qseven Suspended S5 State LED
D26
Qseven Suspended State LED
D29
FPGA (CAN SoftCore) LED