
E
N
G
L
IS
H
Conergy AS
Owners Manual
1
15. Assemble and install the Hot Connection Union assembly
(Detail A)
as follows:
16. Slide the
3
/
4
” BSP Compression Union Assembly
(Detail D, 60-1003)
to the bottom left corner
connection of the array. Tighten the assembly taking care not to twist the copper tubes of the
collector. Make sure you use correctly sized spanners and that the nut is held steady whilst the
compressing union is tightened.
The collector array is now completed and ready for connection to the water heater system.
a. Take the temperature well
(Detail A – 60-1072)
and slide it onto the copper spigot at the
top right of the collector array. Tighten the assembly taking care not to twist the copper
tubes of the collector. Make sure you use correctly sized spanners and that the nut is held
steady whilst the compressing plug is tightened.
b. Apply thread tape or suitable sealant onto the
1
/
2
” BSP thread of the Temperature Well.
(Detail A, 60-1074)
c. Insert the Temperature Well into the
1
/
2
” BSP socket end of the Hot Connection Union
and tighten normally. Take care not to over tighten.
d. Apply thread tape or suitable sealant onto the
3
/
8
” BSP thread of the Air Bleed Valve.
(Detail A, 60-1028)
e. Screw fit the Air Bleed Valve into the top
3
/
8
” BSP socket and tighten.
f. Open the Air Bleed Valve by turning the knob on top anti-clockwise 1
1
/
2
turns from closed.
Detail A-1
(Closed Circuit Systems)
Detail A
(Open Circuit Systems)
60-1072
60-1028
60-1074
Detail B
Detail C
60-1004
Collector Installation