background image

 

CONDOR PIT-STOP / TRAILER-STOP TRAILER ADAPTOR KIT INSTRUCTION MANUAL 

 

 

STOP!  WARNING:  READ THIS FIRST! 

First Read and Understand the Instruction manual and product labels for important safety, set-up and troubleshooting information If you have problems setting up or using 
the Condor

TM

 Pit-Stop, contact customer service @ 1-630-497-1962 or contact us via e-mail @ 

www.condor-lift.com

.  Condor

TM

 Pit-Stop is not intended for use by children.   

 

Assembly Instructions

Remove all parts from shipping box. Check the parts below to make sure you have all the parts needed to assemble your Condor

TM 

Pit-Stop 

before beginning.  In the unlikely event that you find a part damaged or missing, please call customer service @ #815-754-5418

  

Condor Pit-Stop Parts Packing list:

 

PICTURES OF PARTS 

KEY QUANTITY

PART 

DESCRIPTION 

 

  

 

J 1 

Trailer 

Bracket 

 

  

 

Socket Shoulder Screw-3/8x3/8 Thread-5/16-18 

 

  

 

Large Washer (Fender Washer 5/16 x 1.25) 

 

  

 

Flat Head Socket Cap Screw 82i  5/16-18 X 2-1/2  

 

  

 

Lock Nut  5/16-18 

 

      

 

 

Spade Head w/shoulder thumb Screw (5/16-18 x 1.0) 

 

User Instructions: 

R

Q

O

J

P

K

 

 

 

Step1: Attach parts K to the Condor Pit-Stop/Trailer-Stop cross bracket as 
shown.  (Torque parts K to 18 ft-lbs)  
 
Step2: Attach part J to mounting platform first.  Allow a minimum of 10.0" of 
space on the mounting surface from the center of the trailer bracket J to the 
locked end of the Condor Pit-Stop/Trailer-Stop.  The Condor unit should 
always be fully planted on the mounting platform when engaged into the 
trailer bracket J.  Place part J parallel to platform end using the 
recommended dimension and drill holes for part P using a 5/16 drill bit. 
 
Step3: Once the holes for part J are drilled, secure it using parts P, O and Q.  
Run Part P through part J and through mounting platform.  Once part P has 
passed through the mounting platform, secure it with parts O and Q.  Make 
sure that parts O and Q are secured as shown. Torque Q to 18-24 ft-lbs. 
 
 

 

Step4: As shown, place Condor unit into Trailer bracket by inserting parts K 
into part J key way.  Once parts K have entered the keyway of part K, slide 
the Condor unit forward and in the direction of the keyway path.  Unit must 
slide in smoothly.  If unit does not slide easily, use included washers under 
parts K to increase clearance to compensate for floor flatness.  Once unit is 
locked into part J, proceed to use part R to secure and lock unit in place. 

 

 

 
 
 

Reviews: