background image

- 5 - 

3.   Slide the 2" OD element that has the EXTREN

®

 insulators installed in the U-Bolts as shown 

below. Adjust the EXTREN

®

 insulators so they are centered on the U-Bolts. Tighten the U-

Bolts evenly so the length of the exposed threads is approximately equal. Any U-Bolt should be 
tightened evenly from side-to-side with an equal amount of thread above each nut. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4.  Install the studded band clamp (antenna feedpoint) at the bottom of the 2" OD aluminum  

element as shown below. Use a small amount of Penetrox A between the studded band clamp 
and the 2" OD aluminum element. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
5.  Assemble the vertical sections as shown in

 Figure 1

 using the stainless 

steel element clamps allowing an 8 inch overlap between the 72" long 
element sections. The top 36 " element is slid in 12". Slide all the clamps 
over each section before putting them together. You can lightly tighten the 
clamps just below the slits in each section to hold them until needed. 
Align the clamp screws on each section to face the same direction. At final 
assembly, body of the clamp should be positioned between the slits in the 
tubes and 1/8" from the edge of each tube as shown to the right. The top 3 foot section is 
inserted 12" and the three 6 foot element sections have an overlap of 8" to give you a starting 
overall length of 24 feet. During tuning, you will make slight adjustments to get the center 
frequency to where you want it. 

Summary of Contents for COM-30VA

Page 1: ...cal Antenna COM 30VA COM 30VA INS Revision 0a COMTEK SYSTEMS 2010 P O Box 1491 Akron OH 44309 1491 USA Phone 800 777 0703 Technical Support and International 330 572 3200 Fax 330 572 3279 E mail Info...

Page 2: ...nna elements 2 Element Clamp Stainless Steel for 1 7 8 and 2 antenna elements 2 Stainless Steel Saddle for 2 V Bolts for customer supplied mounting pipe 2 V Bolt for 1 to 2 OD customer supplied mounti...

Page 3: ...en pour in the hole Fill the hole until the concrete is level with the ground around it Use a level as you fill the hole to be sure the pipe is straight Allow to set overnight Your location landscape...

Page 4: ...ineering DXE P8A Penetrox A Anti Oxidant should be used between all antenna element sections Penetrox is an electrical joint compound to affect a substantial electrical connection between metal parts...

Page 5: ...tions as shown in Figure 1 using the stainless steel element clamps allowing an 8 inch overlap between the 72 long element sections The top 36 element is slid in 12 Slide all the clamps over each sect...

Page 6: ...exposed threads is approximately equal Any V Bolt should be tightened evenly from side to side with an equal amount of thread above each nut 8 Connect the center conductor of your coaxial feedline to...

Page 7: ...y and shortening it raises the frequency The top element section is made moveable by loosening the element clamp and then sliding the upper element section of the antenna either closer to the base of...

Page 8: ...e in writing The above warranties shall not extend to any products or parts thereof which have been subjected to any misuse or neglect damaged by accident rendered defective by reason of improper inst...

Reviews: