![Comtech Xicom Technology XTD-750K Operation And Installation Manual Download Page 119](http://html1.mh-extra.com/html/comtech-xicom-technology/xtd-750k/xtd-750k_operation-and-installation-manual_2648551119.webp)
MNC-0600-003
3 of 6
Revision D
Preventive Maintenance
Preventive Maintenance
Requirements
Monthly
Inspect the Air Inlet and Exhaust Ports. Ensure the ports are
unobstructed. Remove any:
•
Lint
•
Leaves
•
Straw
Quarterly
Inspect and clean:
•
the cooling fins.
•
the electrical connections; make sure all connections are clean and
tight.
•
the Lower Deck Cover.
Spare Amplifiers
To ensure the working integrity of spare amplifiers, within the
first 6 months following delivery, Xicom Technology
recommends:
•
that spare amplifiers be fitted with an output waveguide load.
•
AC power turned ON.
•
After FTD the High Voltage should be turned ON.
If any problems are encountered they should be reported to
Xicom Technology Customer Service. Contact information is
located in the chapter titled
Overview
.
EAR EXPORT CONTROLLED: The information contained in this Manual refers or relates to a product that is subject
to the U.S. Export Administration Regulations (EAR). Transfer of data herein by any means to a Foreign Person,
whether in the U.S. or abroad, may require an export license from the U.S. Department of Commerce.