![Comtech EF Data CDM-2020 Operator'S Manual Download Page 36](http://html1.mh-extra.com/html/comtech-ef-data/cdm-2020/cdm-2020_operators-manual_2648440036.webp)
Rack Installation, Operator’s Guide, Rev.1
Typical Rack Installation 3-2
T
T
y
y
p
p
i
i
c
c
a
a
l
l
R
R
a
a
c
c
k
k
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
IMPORTANT
The MIDAS System will not accept the Comtech EF Data SDM-300A
with Mux, Flex Mux, or the 100-pin J8 I/O connector installed.
W
W
o
o
r
r
k
k
s
s
t
t
a
a
t
t
i
i
o
o
n
n
The user shall construct a workstation to their specification, using the
equipment recommended by Comtech EF Data. Figure 3-1 illustrates a basic
workstation.
Note:
Refer to
MIDAS Software Installation Guide
.
Connect supplied Y-Cable as follows:
1. Connect the supplied-cable base connector to the FASTCOM card.
2. Connect supplied-cable Port 1 connector to the Comtech EF Data supplied
EIA-422 cable from SNM-1001 Modem.
3. Cable Port 2 connector is not connected.
4. Connect 9-pin EIA-232 cable from Controller Server COM 1 port to SNM-1001
M&C
port.
5. Connect 9-pin EIA-232 cable from Controller Server COM 2 port to SNM-1002
M&C
port.
6. Connect 25-pin pre-programmed dongle to Controller Server 25-pin I/O port.
Summary of Contents for CDM-2020
Page 2: ......
Page 8: ...Rack Installation Operator s Guide Rev 1 Preface vi This page is intentionally left blank...
Page 10: ...Rack Installation Operator s Guide Rev 1 Preface viii This page is intentionally left blank...
Page 17: ...Rack Installation Operator s Guide Rev 1 Introduction 1 5 Figure 1 2 Wiring Diagram...
Page 44: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...