LBC-4000 L-Band Up/Down Converter System
MN/LBC4000.IOM
Installation and Startup
Revision 5
3–7
3.2.2
Install the Optional Rack Slide Set
CEFD Part Number
Description
FP/SL0007
Bearingless Rack Slide Set – 22”
FP/SL0008
Bearingless Rack Slide Set – 24”
FP/SL0006
Bearingless Rack Slide Set – 26”
Figure 3-4. Install the Optional Rack Slide Set
If the converter is to be mounted on slides, install the provided bearingless rack
slide set into the rack cabinet, and onto the sides of the LBC-4000. Use the
hardware provided with the slide set that is determined to be appropriate for
installation.
Do these steps to install the slide set (
1.
Use the provided hardware to install one slide onto each side of the unit
chassis.
2.
Use the provided hardware to install the slide rail components into each
interior side of the equipment rack cabinet.
Summary of Contents for CD-MNLBC4000
Page 72: ...LBC 4000 L Band Up Down Converter System MN LBC4000 IOM Firmware Update Revision 5 5 16 Notes...
Page 154: ...LBC 4000 L Band Up Down Converter System MN LBC4000 IOM Appendix A Revision 5 A 8 Notes...
Page 164: ...LBC 4000 L Band Up Down Converter System MN LBC4000 IOM Appendix B Revision 5 B 10 Notes...
Page 165: ......
Page 166: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...