Installation Instructions
CP-AR24-8 Model
GROUND SPACE 20’ X 6’
RESIDENTIAL
MINIMUM PLAY SPACE 33’ X 32’
16’ Swinging Clearance
32’
33’
Dig Leg Holes for Cementing in the set
#3 Assembling Swing Hangers on
Top Rail
1.
Set top section aside to complete
digging holes.
2.
Mark and attach swing hangers on
top rail. (See the next page for swing
hanger assembly)
30”
20” 24”
20”
30”
30”
20”
24” 20” 30”
Summary of Contents for CP-AR24-8
Page 5: ......