When you are satisfied that the structure is level, mix and pour the
concrete according to the package directions. You
will use
approximately
four
80 lb. bags in
each leg hole.
Concrete will cure faster in warm conditions and slower
in cold
conditions. The package directions on the concrete
you buy will indicate
approximate curing times. If you are in doubt, it
is better to wait longer
allowing the concrete more time to cure. We recommend
3-5 days
before use.
The amount of concrete to be used in each hole may
vary. For
example: If you are installing your play structure
into a grassy area, you
may want to leave the concrete about three to four
inches below the top
of the hole. This will allow you to replace the sod
and have enough soil
depth for the grass to continue growing. As a result
of this, you will use
a lesser amount of concrete than someone who chooses
to fill the
concrete to the top of the hole. The concrete should
only be filled to the
top of the hole if you are planning to install 6 –
12 inches of soft fall
ground cover. The concrete footings should never be
exposed as this
presents a potential risk of injury to those who use
this play equipment.
Double Check and Secure:
Before using your swing set,
double
check and secure any loose set screws or nuts and
bolts and enjoy
your Component Playground.
Allow all of the concrete
to cure
completely before using your playground. (3-5 days)
.
After concrete has cured, assemble and attach swing
chains
and seats.