Compliance West LCB-1010-B Instruction Manual Download Page 11

 

Section 4 

Maintenance and Calibration 

 

WARNING 

 

MAINTENANCE  AND  CALIBRATION  INSTRUCTIONS  ARE  FOR  QUALIFIED  PERSONNEL 
ONLY.  TO AVOID ELECTRIC SHOCK, DO NOT PERFORM ANY SERVICING OTHER THAN 
THE CONTAINED IN THE OPERATING INSTRUCTIONS. 

Introduction 

 
This section of the manual contains maintenance information for the LCB leakage measurement instrument. 
A 1-year calibration cycle is recommended to maintain the specifications of the factory.  

 

Service Information 

 
The LCB tester is warranted to the original purchaser for a period of 1 year. This warranty does not cover 
problems  due  to  misuse  or  neglect.    Malfunctions  which  occur  within  the  limits  of  the  warranty  will  be 
corrected at no charge.  Mail the instrument postpaid to the manufacturer. Dated proof of purchase is required 
for all in-warranty repairs. The manufacturer is also available for calibration and / or repair of instruments 
that are beyond their warranty period. Contact the manufacturer for a cost quotation. Ship the instrument and 
your remittance according to the instructions given by the manufacturer.

 

 

General Maintenance 

 

To avoid contaminating the PWB with oil from your fingers, handle  it by the edges or wear gloves. If the 
PWB becomes contaminated, refer to the cleaning procedures given later in this section

.

 

 

WARNING 

Remove all external connections before opening the LCB.  Do not connect the LCB to hazardous live 
circuits with the internal circuitry exposed. 

 

Cleaning 

 

CAUTION 

Do not use aromatic hydrocarbons or chlorinated solvents for cleaning.  These solutions will react with 
the plastic materials used in the instrument.

 

 
Clean the exterior of the LCB with a mild solution of detergent and a damp sponge. Clean dust from the PWB 
with clean, dry, low pressure (<20 psi). 
 

Calibration Information 

 
The Calibration Procedure should be performed annually and any time the instrument has been repaired.  The 
calibration  procedure  should  be  performed  at  an  ambient  temperature  of  23

5

C  (73.4

9

F).  The 

Calibration procedure must be performed by qualified personnel, for more information contact Compliance 
West USA.

Summary of Contents for LCB-1010-B

Page 1: ......

Page 2: ......

Page 3: ...the art accuracy for making leakage current measurements To fully appreciate all the features of your new instrument we suggest that you take a few moments to review this manual Compliance West USA s...

Page 4: ......

Page 5: ...1010 1 2010 Fig A 4 3 Section 3 4 Operating Instructions 4 Setting up your Tester 4 Fuse Verification Check 5 Verification of Proper Operation 5 Section 4 6 Maintenance and Calibration 6 Introduction...

Page 6: ...y must be used with a suitable voltmeter to perform leakage current measurements The voltmeter used can significantly affect the results of the measurement The voltmeter used must have adequate freque...

Page 7: ...s specified in this manual Voltage Rating 0 264Vrms AC to enclosure O V Cat II 50 440Hz at input terminals1 Current Rating 100mA maximum Fuse Rating F1 Littelfuse 370 series type TR5 rated 63mA 250V f...

Page 8: ...o connect to EUT Rs 1500 Ohm Cs 0 22 uF Rb 500 Ohm C D Output terminals for connection to voltmeter Configuration 3 IEC 61010 1 2010 Fig A 4 Table 3 Configuration 3 Specifications A B Input terminals...

Page 9: ...the front of the instrument One end of each cable is connected to a detachable terminal block as shown in Error Reference source not found below The other end of each cable is unterminated these wires...

Page 10: ...the following table to know the measurements points and the expected value depending on your LCB configuration If any of your measurements are out of tolerance please contact the manufacturer for fur...

Page 11: ...anufacturer for a cost quotation Ship the instrument and your remittance according to the instructions given by the manufacturer General Maintenance To avoid contaminating the PWB with oil from your f...

Page 12: ...e West USA is available Phone 800 748 6224 Hours 8 00 AM 4 00 PM Pacific Time Also available on our web site at www compwest com Contact Compliance West USA 650 Gateway Center Way Suite D San Diego CA...

Page 13: ...000 1500 2000 2500 10 100 1K 10K 100K 1M Input impedance Frequency Hz Input Impedance tolerance limts per CTL DSH 251B 0 100 200 300 400 500 600 10 100 1K 10K 100K 1M Transfer impedance Frequency Hz T...

Page 14: ...0 1500 2000 2500 10 100 1K 10K 100K 1M Input impedance Frequency Hz Input Impedance tolerance limts per CTL DSH 251B 470 480 490 500 510 520 530 10 100 1K 10K 100K 1M Transfer impedance Frequency Hz T...

Page 15: ...500 600 700 800 900 1000 10 100 1K 10K 100K 1M Input impedance Frequency Hz Input Impedance tolerance limts per CTL DSH 251B 470 480 490 500 510 520 530 10 100 1K 10K 100K 1M Transfer impedance Frequ...

Reviews: