12
Initial Checkout Procedure
The following procedure will verify that the
Tester is working correctly. We recommend that
this procedure be conducted periodically to
ensure proper operation of the Tester.
The following items are needed to conduct this
procedure:
A three inch piece of 18 AWG insulated
hookup wire with each end stripped back
½".
A test lead with a banana plug on one end.
The other end will be clipped to the
alligator clip end of the black test lead
supplied with the HT-2800.
CAUTION
High voltage (up to 2800 Volts
DC) generated by the HT-2800 is
exposed during this test. A risk
of shock exists. Exercise care
when using the HT-2800.
1.
Connect the Tester to a proper source of
supply using the included 18 AWG power
supply cord. Turn the HT-2800 on.
2.
Turn the
Ground Check
switch on the rear
panel to Off.
3.
Disconnect all leads and turn the Tester
on.
4.
Push the red
RESET
button. Verify the
yellow
TEST
button is lit.
5.
Push the yellow
TEST
button.
6.
The Tester should conduct a test
sequence. At the end of the test, the
Ground OK
,
Ground Open
,
Full Voltage
,
Hipot Pass
, and red
RESET
LED’s should
be lit.
7.
Turn the Ground Check switch on the rear
test panel On.
8.
Verify that all test leads are disconnected.
9.
Push the red
RESET
button, then the
yellow
TEST
button.
10.
The Tester should sound the buzzer. The
Ground Open
and red
RESET
lamps
should be lit.
11.
Plug the supplied Test Return Lead into
the Return jack on the front panel.
12.
Connect the banana plug of the extra test
lead into the grounding jack of the Orange
High Voltage Device receptacle. The
grounding jack is circular in shape and is
located next to the triangle printed on the
front of the High Voltage Receptacle.
13.
Connect the other end of the extra test lead
to the supplied test lead plugged into the
Return Jack.
14.
Push the Red
RESET
button then the
yellow
TEST
button.
15.
The Tester should conduct a test
sequence. At test termination, the
Ground
OK
,
Full Voltage
,
Hipot Pass
, and Red
RESET
LED’s should be lit.
16.
Turn the Ground Check Switch on the rear
panel "Off".
17.
Disconnect the extra test lead from the
Device receptacle. The supplied test lead
should remain plugged into the Return
receptacle on the front panel.
18.
Connect one end of the hookup wire to the
clip of the Test Return Lead and insert the
other end into one of the vertical parallel
slots in the High Voltage Device receptacle
on the front panel.
Keep clear of the wire
while the test is in progress
.
19.
Push the
RESET
button and then push the
TEST
button.
20.
The tester should conduct a test sequence,
terminated with a buzzer. At test
termination, the
Ground OK
,
Ground
Open
,
Excess Leakage
, and red
RESET
LED’s should be lit.
21.
Note: Depending on the connection made
by the hookup wire in the Device
receptacle, the
Hipot Fail
LED may also
light.
Note: The following procedure
tests the "Hipot Breakdown"
circuit of the HT-2800 and involves
high voltage. The only exposed
parts during this test are at ground
potential. However, the voltage
inside the High Voltage Device
socket may be as much as 2800
volts. Proceed with caution.
22.
Make sure the Test Return Lead is still
plugged into the
RETURN
jack on the
front panel.
23.
Make sure the
Ground Check
switch on
the rear panel is Off.
24.
Remove the hookup wire from the
DEVICE
Receptacle, but leave it connected to the
clip of the Test Return Lead. Carefully
hold the Test Return Lead by the insulated
clip boot.