background image

• 

Mounting, electrical installation, commis

-

sioning, maintenance and repair may only 

be carried out by a trained electrician. The 

electrician must be registered in the regis-

ter of installers.

• 

Mounting, electrical installation, commis

-

sioning, maintenance and repair may only 

be carried out by a trained electrician. The 

electrician must be registered in the regis-

ter of installers.

•  No liability will be accepted for damage 

during transport if the product is trans-

ported in anything other than the original 

packaging.

• 

At all times, observe the local safety 

regulations for the country in which you 

operate the device.

  3 Assembly

  3.1  Choice of location

•  The payment terminal must not be in-

stalled in explosive atmosphere areas (EX 

areas).

•  The payment terminal must not be instal-

led in areas prone to flooding or earthqua

-

kes.

•  If possible, mount the payment terminal 

protected from direct sunlight.

•  The payment terminal must not be instal-

led in places where it blocks escape routes 

or passages for people.

•  The payment terminal must not be moun-

ted in places where it is exposed to direct 

jets of water (e.g. high-pressure cleaners or 

car washes).

• 

Observe the permissible ambient conditi

-

ons (see chapter 6).

  3 .2  Prerequisites

• 

In addition to a residual current circuit 

breaker and a circuit breaker, an overvol

-

tage protection must always be installed 

in the sub-distribution. We recommend 

the „Dehn Guard DG TT 5 275“ as surge 

protection.

 

  3.3  Mounting of the payment terminal on the wall

Minimum distances:

Figure 1: Minimum distances

The specified minimum distances of 40 cm (A) 

must be observed to ensure safe operation of 

the charging stations and unrestricted access 

for maintenance work.
The specified minimum distances between the 

charging station and the ground (B) are recom

-

mended.

 The following accessories are required:
• 

2 brackets, included in delivery

To mount the payment terminal on the wall, 

proceed as follows:

1. 

The payment terminal is mounted directly 

on the wall without a wall mounting plate.

2.  To attach the cover, mount two brackets 

on the back of the hood to the mounting 

holes of the payment terminal using dou-

ble-sided tape.

  3.4  Mounting of the column

In order to be able to mount the column, a 

foundation must first be laid. This preliminary 

work must be carried out by a contracted cons

-

truction company.

  3.4.1  Use of the prefabricated foundation

This significantly simplifies the mounting of the 

charging column. In this prefabricated founda

-

tion two empty pipes and the foundation plate 

with four threaded rods are already cast. The 

shape of the prefabricated foundation may dif

-

fer from the shape in Figure 2 and Figure 3. The 

shape and dimensions of the foundation plate, 

which can be seen in Figure 4, are relevant.

Summary of Contents for X-pay

Page 1: ...Installation manual Compleo X pay 215041 b 02 2022...

Page 2: ...2 10...

Page 3: ...he wall 5 3 4 Mounting of the column 5 3 4 1 Use of the prefabricated foundation 5 3 4 2 Casting of an own foundation with foundation plate 6 3 4 3 Casting of an own foundation without foundation plat...

Page 4: ...it rains when installing the payment ter minal make sure to protect the payment terminal from water Do not use explosive or readily flammable substances in the vicinity of the payment terminal Before...

Page 5: ...er and a circuit breaker an overvol tage protection must always be installed in the sub distribution We recommend the Dehn Guard DG TT 5 275 as surge protection 3 3 Mounting of the payment terminal on...

Page 6: ...ide view Figure 5 Foundation plate top view To cast your own foundation with foundation plate proceed as follows 1 For the foundation dig an excavation pit with a minimum area of 100 x 80 cm and a min...

Page 7: ...inal assignment X1 for supply cable cable cross sections and fuse protection Performance class 3 7 kW 16 A Conduc tor Number Color L 1 brown or black N 2 blue PE 3 green yellow Supply cable NYM J 3x 1...

Page 8: ...XC ST If none of the test devices is available to you the missing tests must be performed by a Compleo specialist partner Enter the result of the test in a test report A test report can be obtained fr...

Page 9: ......

Page 10: ...All rights reserved This document may not be copied or reproduced in any form or by any means in whole or in part without written permission All illus trations in these assembly instructions serve on...

Reviews: