
Personal Thermal Technology
_______________________________________________________________________________________
COMPCOOLER
Personal Thermal Technology
Add: A1
HenChangRong Tech Zone, Huaning West Road, Dalang, Longhua, Shenzhen, China
Preparation: Unit Connection and Primary Circulation
Bladder Connection:
Fill water into Roll-Top, do not fill above overfill line.
Connect the bladder Outlet/Inlet with backpack unit.
Checking: bladder no leaks, quick fittings connection is fine,
Vest Connection:
Connect backpack unit with cooling vest, once you hear a click, it
’
s in position.
Checking: Vest no leaks, quick fittings connection is fine.
Start circulation:
Press On/Off switch, Pump circulates water from bladder into micro tubing cooling
channels of cooling vest, then flow back to bladder. User may see the water flow back to
bladder from Inlet fitting.
Checking: Battery works fine, pump works fine.