background image

Compaq ProLiant ML350 G2 Service Overview

12

Rev. 1.0

Page 

12 of 24

Rack Model

Customers can buy the ProLiant ML350G2 in either a tower or rack form factor.  A rack
conversion kit is available for converting a tower into a rack model.

Summary of Contents for ProLiant ML350 (G2)

Page 1: ...3 What s New 3 Features Carried Over 11 Models 13 Option Kits 14 Spare Parts 15 Operating Systems 16 Drivers 16 Manageability Utilities 16 Installation Procedures 17 Processors 17 Memory 20 Hot plugga...

Page 2: ...and other countries All other product names mentioned herein may be trademarks of their respective companies Compaq shall not be liable for technical or editorial errors or omissions contained herein...

Page 3: ...2KB of L2 full speed cache Tower or rack form factors 5U 350W hot pluggable HP power supply redundant power supply option 1 1 No hard drive shipped standard Ten internal drive bays Four 5 25 x 1 6 rem...

Page 4: ...form multiple ROM upgrades all at once Redundant ROM If the server either loses power during a ROM flash or if the flash process is otherwise interrupted redundant ROM allows you to restart the system...

Page 5: ...ent temperature of the chassis When any of these three temperatures reaches a predefined limit the fan speed increases to control the temperature in the system Server Feature Bus The Server Feature Bu...

Page 6: ...e enough to generate a crash dump log The button is enabled disenabled in RBSU Warning The NMI Debug button causes the unit to abruptly fail as it is designed to do Therefore it should never be used d...

Page 7: ...ernal health LED Red System health critical Off System off no AC power Green System on redundant power supply health OK 4 External health LED Amber Redundant power supply degraded 5 Power button Off S...

Page 8: ...temperature control Server Feature Board and fans Externally serviceable components hot pluggable power supplies Embedded NIC The NIC information is also represented on the rear panel with the three L...

Page 9: ...rd is not installed properly Off Processor 2 temperature normal 5 Processor 2 thermal Amber Thermal trip detected for processor 2 Verify Processor and heatsink assembly is properly installed Ambient t...

Page 10: ...Verify Processor and heatsink assembly is properly installed Ambient temperature is within an acceptable range 3 Off Processor 1 functioning 10 Processor 1 status Amber Processor 1 failed Off PPM 1 fu...

Page 11: ...the SCSI knockouts in the back panel using the Internal to External SCSI Cable Option Kit4 SCSI port 2 ships with a two device cable to support an internal tape drive Note Port 2 is a single connecto...

Page 12: ...ML350 G2 Service Overview 12 Rev 1 0 Page 12 of 24 Rack Model Customers can buy the ProLiant ML350G2 in either a tower or rack form factor A rack conversion kit is available for converting a tower in...

Page 13: ...models Table 3 System Models Model Part Number Config Code Processor Rack or Tower ML350T02 P1133 512KB 128MB 236868 xx1 JZP1 1 133GHz Tower ML350R02 P1133 512KB 128MB 236869 xx1 JZP2 1 133GHz Rack M...

Page 14: ...1 GB Wide Ultra3 SCSI 10 000 rpm Drive 1 142671 B22 18 2 GB Wide Ultra3 SCSI 10 000 rpm Drive 1 142673 B22 18 2 GB Wide Ultra3 SCSI 15 000 rpm Drive 1 188122 B22 36 4 GB Wide Ultra3 SCSI 10 000 rpm 1...

Page 15: ...upply Blank 249923 001 PC 133 MHz ECC Registered SDRAM DIMM 128 MB 159226 001 PC 133 MHz ECC Registered SDRAM DIMM 256 MB 159304 001 PC 133 MHz ECC Registered SDRAM DIMM 512 MB 159227 001 PC 133 MHz E...

Page 16: ...ration 2 servers feature new hardware that does not have driver support on all operating system installation media Use SmartStart and its Assisted Path feature to install your operating system and the...

Page 17: ...ocket Only install the specific PPM provided in the option kit with your processor Table 6 Processor Installation Step Action 1 Verify that all critical data has been backed up 2 Ensure the server has...

Page 18: ...sor socket lever and then place the processor into the socket as shown below Use the processor socket guide posts to align the processor Caution Performing these steps in reverse order will cause the...

Page 19: ...ng PPM before powering up the server See Installing the PPM for Processor 2 11 Reinstall the fan baffle and reinstall the access panel by reversing Steps 3 and 4 Processor Power Module PPM Important A...

Page 20: ...registered 133MHz ECC SDRAM DIMMs The DIMMs must support CAS Latency 2 or 3 The memory bus and controller are not compatible with older 100MHz DIMMs Standard memory in all ML350 G2 models is a single...

Page 21: ...emove the thumbscrew that secures the redundant power supply blank and then lift the blank form the back of the server 4 Slide the power supply into the power supply bay Apply pressure to the power su...

Page 22: ...switch is off the server is configured as a tower If it is on the server is configured as a rack Table 9 System Models Switch Default Function 1 Off Off Video enabled On Video disabled 2 Off Off Norm...

Page 23: ...ice Guide First Edition August 2001 Part Number 236634 001 or spare part number 250840 001 Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide First Edition August 2001 Part Number...

Page 24: ...Compaq ProLiant ML350 G2 Service Overview 24 Rev 1 0 Page 24 of 24...

Reviews: