Installation Checklist
When a new unit is being installed use the following checklist to make sure the unit is fully
operational. Check each box or write N/A where not applicable. Refer to the relevant installation
manual for procedures.
Mechanical Checks
Yes No
Check unit is undamaged and has not been tampered with.
Is the unit in a sheltered position and facing away from the prevailing
wind and rain?
Check all panels are securely fastened using tamper-proof fastenings
where supplied.
Check that all cable entries to unit are through glands.
Power on Checks
Yes No
Check that the CE board, FMS board, pinpad, printer, cardreader, router
and modem all power up.
Check pumps are re-priced to the current fuel price.
Check that different fuels are correctly priced on all hoses.
Transaction Checks
Yes No
Complete transaction using white card/CWID/HID/Pin authorisation
methods
Complete transaction using credit card (credit card DCA only).
Check that all hoses can be selected and authorised by the unit.
Check all hoses stop on or before the pre-authorised value (credit card
DCA only).
Receipt Checks (where fitted)
Yes No
Check that the correct $, L and fuel grade are printed on the receipt.
Check the date, time and header information is correct.
USB Module Checks (where fitted)
Yes No
Check the supplied USB key is recognised by the unit.
Select "Get Transactions" and check that transactions are uploaded to
the USB key.