![CommScope Ruckus ICX 7750 Hardware Installation Manual Download Page 23](http://html1.mh-extra.com/html/commscope/ruckus-icx-7750/ruckus-icx-7750_hardware-installation-manual_2643846023.webp)
Ruckus ICX 7750 Switch Hardware Installation Guide
21
Part Number: 53-1003900-10
Installing the Ruckus ICX 7750
Installation tasks
Rack considerations
For successful installation and operation of the switch in a rack, ensure the following rack requirements are met:
•
The rack must be a standard EIA rack.
•
The equipment in the rack is grounded through a reliable branch circuit connection and maintains ground at all times. Do not rely
on a secondary connection to a branch circuit, such as a power strip.
•
Airflow and temperature requirements are met on an ongoing basis, particularly if the switch is installed in a closed or multi rack
assembly.
•
The additional weight of the switch does not exceed the rack’s weight limits or unbalance the rack in any way.
•
The rack is secured to ensure stability in case of unexpected movement, such as an earthquake.
Recommendations for cable management
Cables can be organized and managed in a variety of ways; for example, use cable channels on the sides of the rack or patch panels to
reduce the potential for tangling the cables. The following list provides some recommendations for cable management:
NOTE
You should not use tie wraps with fiber-optic cables because they are easily overtightened and can damage the optical fibers.
Velcro-like wraps are recommended.
•
Plan for the rack space required for cable management before installing the switch.
•
Leave at least 1 m (3.28 ft) of slack for each port cable. This provides room to remove and replace the switch, allows for
inadvertent movement of the rack, and helps prevent the cables from being bent to less than the minimum bend radius.
•
For easier maintenance, label the cables and record the devices to which they are connected.
•
Keep LEDs visible by routing port cables and other cables away from the LEDs.
Installation tasks
Follow the steps listed in
to install your device. Details for each of these steps are provided on the pages indicated.
CAUTION
Before plugging a cable to any port, be sure to discharge any static charge stored on the cable by touching the electrical
contacts to ground surface.
TABLE 8
Installation tasks
Task
number
Task
Where to find more information
1
Ensure that the physical environment that will host the device has the proper
cabling and ventilation.
“Installation and safety considerations”
2
If customizing a Ruckus ICX 7750 baseline chassis:
1
Install at least one power supply unit.
2
Install at least three fans.
3
Install an expansion module.
“Installing and replacing a power supply unit”
“Installing or replacing the fan tray”
“Installing or replacing an expansion module”
3
Install the device in an equipment rack.