![CommScope OneCell Hardware Installation Manual Download Page 104](http://html1.mh-extra.com/html/commscope/onecell/onecell_hardware-installation-manual_2643754104.webp)
Chapter 6
RP2000 Installation
6-18
M0303A2 4.5.01 September 2020
DR
AF
T
Flown mount installation
1
Attach the threaded, 3/8-inch rod, cut to the required length, to the ceiling.
2
Install the nut and a flat washer on the rod.
3
Slide the octagon box onto the rod and install a flat washer and the nylon lock nut.
Summary of Contents for OneCell
Page 7: ...Contents OneCell Hardware Installation Release 4 5 vii DRAFT ...
Page 10: ...List of tables x M0303A2 4 5 01 September 2020 DRAFT ...
Page 12: ...Document revision history xii M0303A2 4 5 01 September 2020 DRAFT ...
Page 18: ...DRAFT ...
Page 24: ...Chapter 1 CommScope OneCell overview 1 6 M0303A2 4 5 01 September 2020 DRAFT ...
Page 28: ...DRAFT ...
Page 77: ...Chapter 5 RP5100r installation 5 5 M0303A2 4 5 01 September 2020 DRAFT ...
Page 112: ...Chapter 6 RP2000 Installation 6 26 M0303A2 4 5 01 September 2020 DRAFT ...