3. Slide the FTB onto the appropriate mounting bracket at the front of the rack as shown in
.
4. Secure the FTB to the rack mounting bracket using the two #12-24 screws provided.
5. Repeat steps 1–4 for each FTB.
4
MPO TRUNK CABLE INSTALLATION
This involves first preparing the cable and then routing the cable and securing it on the rack. For
details, refer to the topics below.
4.1
Preparing Cable for Installation
Before being installed, the MPO trunk cable must be broken out using the breakout dimensions
shown in
.
Figure 7. MTO Trunk Cable Breakout Dimensions
4.2
Routing and Securing the Cable
MPO trunk cables maybe routed into the FTB from either above or below the rack. Use the
following procedure for routing and securing the MPO cable (see
Caution:
Inspect each cable and clean the MPO connectors before connecting the cable. For
instructions, refer to ADCP-90-379.
13.5 IN.
(34.3 CM)
ONE STRAND
(12 CIRCUITS)
MPO TRUNK
(12 STRANDS)
FURCATION
22714-A