CommScope HELIAX FiberFeed FDH1206-24SE2 Series Installation Manuallines Download Page 11

Visit www.commscope.com for complete specifications on all the products listed 

                    Bulletin # 7689527    Rev. G

Technical Publication

11

Connectors and Adapter cleaning

Clean exposed connector ferrule by lightly moistening lint-free wipe with fiber optic cleaning solution (or >91% 

 

isopropyl alcohol), and by applying medium pressure, first wipe against wet area and then onto dry area to clean 

potential residue from end face. Clean connector ferrule inside adapter by inserting lightly moistened cleaning stick 

with fiber optic cleaning solution (or >91% isopropyl alcohol) inside the adapter until contact is made with connector on 

opposite end. Rotate cleaning stick with medium pressure in one circular motion as it is pulled away from the adapter. 

Repeat process using dry cleaning stick. 

Caution:

 Signal strength will be affected if end and sides of ferrule are not thoroughly cleaned. Discard cleaning 

sticks after each use. Do not turn cleaning sticks back and forth pressing against connector end face. This may cause 

scratches if large contamination is present. Always inspect connector end face for contamination after each cleaning.

Clean adapter by inserting adapter cleaning stick (or fiber adapter sleeve brush) moistened with fiber optic cleaning 

solution (or >91% isopropyl alcohol) inside the adapter and gently pull out with twisting motion. Repeat process with a 

dry cleaning stick.

Caution:

 Do not try to clean adapter with a standard pipe cleaner. The sleeve inner diameter of adapters could be too 

small. Do not try to clean the adapter with cleaning stick if a connector is mounted in one side. Discard cleaning sticks 

after each use.

Clean Tip of Ferrule

Clean Sides of Ferrule

Adapter Brush

Section 7: Breakout Procedure

Remove electrical tape 

from the trunk cable and 

corrugated protection 

tube

While holding the protection tube straight 

pull the tube away from cable. 

After you have pulled the fiber and power 

 

conductors remove electrical tape from the trunk 

cable and remove clear tube for access to all 

optical connectors. 

After the trunk cable has been installed and 

you are ready to make the final connection 

to the RRU or BBU follow these steps for the 

removal of fiber protection tube. 

1

2

3

Summary of Contents for HELIAX FiberFeed FDH1206-24SE2 Series

Page 1: ...e and when it is needed the most in the field The FES team is staffed by an expert team of technicians who in turn are supported by some of the brightest and most experienced product line managers With all of this knowledge and support the FES offers our customers access to hands on specialized training classes Section 1 Direct Breakout Components Accessories 02 Section 2 General Specifications Co...

Page 2: ...STANDAR HANGER FDH1210 24SE2 19256B C SSH L 42396A 1 add grommet HG 24 114 FDH1206 24SE2 19256B C SSH XL 42396A 1 add grommet HG 33 114 Fiber breakout tail NA SSH 47 43211A add grommet HG 5MM 12 Power breakout tail NA SSH 1014 43211A add grommet HG 10MM 12 Breakout Fiber tail with ODC compatible connector Equipment cabinet shelter Hybrid FiberFeed Cable Separate fiber and power conductors Maximum ...

Page 3: ...ty Total Fiber Quantity Shielding Type Fiber Type Dimensions Cable Weight Diameter Over Jacket Breakout Length Fiber end 1 Breakout Length Power end 1 Breakout Length Fiber end 2 Breakout Length Power end 2 Physical Specifications Minimum Bend Radius loaded FDH1206 24SE2 XXX HELIAX FiberFeed UL Type TC OF ER 6 AWG 12 24 Solid copper tape Singlemode fiber 2421 kg km 1627 lb kft 36 2 mm 1 43 in 1000...

Page 4: ... less than 3 m 1 ft below the fibre breakout point Prevent the fibre tails and power conductors from undue movement during hoisting by securing with tie ropes every 1 m 3 ft to the hoisting line During hoisting ensure that there is a free path and that the cable breakouts will not be snagged on tower members or other obstacles Installation temperature range is 20 C to 60 C 4 F to 140 F Minimum cab...

Page 5: ...nical Publication 5 Required Apply provided Tie Wrap to the base of the hoisting grip before applying tension to the line Clevis Steel cable or rope hoist line Hoisting grip Minimum leader 5 3 M 17 ft Maximum 60 M 200 ft between hoisting grips Protective sock Hoisting Considerations Tie back ropes 1 M 3 ft ...

Page 6: ...und the fiber ends in place until ready to make final connect of the jumper at the RRU or BBU DO NOT BEND THE FIBER ENDS TIGHTER THAN 30 mm 1 2 in BEND RADIUS ELSE THERE IS A RISK OF BREAKING THE GLASS FIBERS Attach the main cable securely to the structure or equipment using hangers to prevent strain on connections from movement in wind or snow ice conditions Ensure the fiber and power connections...

Page 7: ...ngers as required Repeat with tails being routed to the RRU and spare fibers If additional hangers are not available slide the protection sleeve from the BBU end over any spare fibers to protect them Place tape over fiber tails and protective sleeve end to hold in place Support protection sleeve using tie wraps Connectors are fully weather sealed and do not require additional weatherizing Unused p...

Page 8: ...Visit www commscope com for complete specifications on all the products listed Bulletin 7689527 Rev G Technical Publication 8 ...

Page 9: ...ubber split grommet around the jacketing with the stepped end towards shroud body Push gasket into the clamping tynes Approximately 0 9 mm will protrude from the tynes when fully installed 4 Engage the compression nut one full revolution to keep the grommet in place but do not tighten fully to allow for adjustment during RRU connection 5 Slide weather shroud down jacketing to allow full access to ...

Page 10: ...mpression nut onto jacketing to complete installation The compression nut must be tightened until it is completely against the cable gland body The grommet will protrude slightly from the compression nut Reverse steps 7 and 8 to remove sleeve for maintenance 2 1 1 2 Correct support clamp locations WARNING Remove the dust caps from DLC connector and seat into the RRU Listen for a distinct click Do ...

Page 11: ... may cause scratches if large contamination is present Always inspect connector end face for contamination after each cleaning Clean adapter by inserting adapter cleaning stick or fiber adapter sleeve brush moistened with fiber optic cleaning solution or 91 isopropyl alcohol inside the adapter and gently pull out with twisting motion Repeat process with a dry cleaning stick Caution Do not try to c...

Page 12: ...eving an efficient fiber optic connection 1 Perfect Core Alignment 2 Physical Contact 3 Pristine Connector Interface Today s connector design and production techniques have eliminated most of the challenges to achieving core alignment and physical contact What remains challenging is maintaining a pristine end face As a result CONTAMINATION is the 1 reason for troubleshooting optical networks Imple...

Page 13: ...eakout NOTE Remember to slide identifier labels down the power conductors before trimming the cable to it s final length If length of cable installed needs to be adjusted you can split the cable at the BBU end using the process below and then coiling the excess fiber subunits in a storage box Patch Panel Kits are available to manage any excess fiber length in the breakouts at the BBU Excess Fiber ...

Page 14: ...on Überprüfung Wartung oder Demontage auftreten Atenção A CommScope abdica do direito de toda responsabilidade pelos resultados de práticas inadequadas e sem segurança de instalação inspeção manutenção ou remoção Avvertenza CommScope declina eventuali responsabilità derivanti dell esecuzione di procedure di installazione ispezione manutenzione e smontaggio improprie o poco sicure CommScope 1100 Co...

Reviews: