background image

Page 5 of 8

© 2019 CommScope, Inc. All Rights Reserved

8.4.4. 

Slide transportation tubing (appox. 40”) over the 

feeder ribbon fibers.

8.4.5. 

Attach transportation tubing to core tube using 

 

felt tape.

8.4.6. 

Route bare ribbon into splice tray.

Note: Fiber splicing should be done in compliance 

with company-approved practices. This section 

outlines some basic splice organizing techniques to be 

followed.

8.4.7. 

Make splice per local practice and store splice 

protector centered in the splice protector holder.

8.4.8. 

When splicing has been completed, re-install top 

cover on the tray, re-install splitter with mounting plate and 

secure with fastener.

Summary of Contents for BUDI-M-FPS

Page 1: ...der cable 1x64 Pre Term Equipped with 24f indoor outdoor cable 1x32 Splice Only Customer will need to splice in a feeder cable 1x32 Pre Term Equipped with 24f indoor outdoor cable 2 Warnings and caution IMPORTANT INSTRUCTIONS Read and understand all instructions Follow all warnings and instructions marked on the product SAVE THESE INSTRUCTIONS Risk of Injury Hazardous Light when fiber is exposed W...

Page 2: ...e with armored cable 5 2 Cable Skirts Plastic and aluminum skirts are available in various sizes 5 3 Expansion Kits Note The following item is for adding a second 1x32 splitter 1x32 PnP Splitter Kit See BUDI M ordering information for additional accessories 2 3 4 5 1 7 6 Open the Box 6 1 Rotate quarter turn fasteners counterclockwise to unlock pull bottom of cover away from base and lift off cover...

Page 3: ...o in 9 4 8 1 2 Insert each release pin in the plate guides and slide until they disengage both sets of latches Once the latches are disengaged pull the front and middle sections of the entry plate away from the box Both the front and middle sections will slide out Note If release pins are not available the plate guides can be disengaged manually by hand or by using a flat head screwdriver 8 1 3 Us...

Page 4: ... access to splice tray Lift the top cover of the tray to make the splice holder accessible 8 4 2 Route central core tube to splice tray and attach with felt tape and cable ties see illustration below 8 4 3 If existing core tubing needs to be replaced cut central core tube to a length of 4 8 2 4 Attach cable strength member to strength member bracket with supplied strength member lug Note Check the...

Page 5: ...nto splice tray Note Fiber splicing should be done in compliance with company approved practices This section outlines some basic splice organizing techniques to be followed 8 4 7 Make splice per local practice and store splice protector centered in the splice protector holder 8 4 8 When splicing has been completed re install top cover on the tray re install splitter with mounting plate and secure...

Page 6: ...ctice and terminate fiber to selected port 1 2 9 3 Repeat step 9 2 to connect all required drop cables Make a bundle of maximum 18 drop cables With the adapter pack still in the raised position wrap a layer of felt tape around the drop cables at a point where the bottom of the felt tape is level with the top of the port seal see photo below This will insure there is slack in the drop cables when t...

Page 7: ...he bundle of drop cables with cable ties to the T shapes of the drop cable bracket 9 6 Splitter Input Jumper Installation A blue SC APC jumper has been provided and was factory installed between Port 67 and the splitter input port Jumper can be re installed to ports 68 to 90 if needed per customer requirements For better hand access to input connector the rear dual fiber adapter may be removed from...

Page 8: ... a number of CommScope s facilities across the globe certified in accordance with international standards including ISO 9001 TL 9000 and ISO 14001 Further information regarding CommScope s commitment can be found at www commscope com About Us Corporate Responsibility and Sustainability 12 Contact information Visit our website or contact your local CommScope representative for more information For ...

Reviews: